Subject is engaged in undertakes work in the field of hydropower, tunnelling, water and waste water management as well as general construction work |
|
|
|
|
No. of Employees
: |
500 persons |
RATING & COMMENTS
|
MIRA’s Rating : |
Ba |
|
RATING |
STATUS |
PROPOSED CREDIT LINE |
|
|
41-55 |
Ba |
Overall operation is considered normal. Capable to meet normal
commitments. |
Satisfactory |
|
Status : |
Satisfactory |
|
Payment
Behaviour : |
No Complaints |
|
Litigation : |
Clear |
NOTES :
Any query related to this report can be made on
e-mail : infodept@mirainform.com while quoting
report number, name and date.
ECGC Country Risk Classification List – September 30th, 2011
|
Country Name |
Previous Rating (30.06.2011) |
Current Rating (30.09.2011) |
|
Nepal |
b1 |
b1 |
|
Risk Category |
ECGC
Classification |
|
Insignificant |
A1 |
|
Low |
A2 |
|
Moderate |
B1 |
|
High |
B2 |
|
Very High |
C1 |
|
Restricted |
C2 |
|
Off-credit |
D |
Himal Hydro and General Construction Ltd
Location:-
Head office
Chhauni Housing Complex
Bahiti
Kathmandu,
Nepal
Location Owned
Tel: (00 977) (1) 403 8030
Fax: (00 977 (1)
403 8026
E-Mail : mail@himalhydro.com.np
Web : www.himalhydro.com.np
Postal address:
Post
Box No. 12268
Kathmandu
Nepal
Employees: 500
Company Type: Public Independent
Incorporation Date:
03.05.1978
Reporting Currency: Nepalese
Rupee
Total Assets: NA
Undertakes work in the field of hydropower, tunnelling,
water and waste water management as well as general construction work. ISO
9001:2008
Industry
Industry Construction Services
ANZSIC 2006: 3109 - Other Heavy
and Civil Engineering Construction
NACE 2002: 4521 - General
construction of buildings and civil engineering works
NAICS 2002: 237990 - Other
Heavy and Civil Engineering Construction
UK SIC 2003: 45213 - Construction
of civil engineering constructions
US SIC 1987: 1629 - Heavy
Construction, Not Elsewhere Classified
|
Name |
Title |
|
P. Srestha |
Director |
|
S. Sharma |
Director |
|
S K Shrestha |
Director |
|
D B Singh |
Director |
|
M P Sharma |
Director |
|
David Mcconkey |
Director |
1 - Profit & Loss Item Exchange Rate: USD 1 = NPR
2 - Balance Sheet Item Exchange Rate: USD 1 = NPR
Information Parted By
Name : Mr. Phub Dorji Tamang
Designation : Finance Manager
Date : 23.12.2011
Location:-
Head Office
Chhauni Housing Complex
Bahiti
Kathmandu, Nepal
Tel: (00 977) (1) 403 8030
Fax: (00 977 (1)
403 8026
E-Mail : mail@himalhydro.com.np
Postal address:
Post
Box No. 12268
Kathmandu
Nepal
Assets NPR(mil): NA
Employees: 500
Industry: Construction
Services
Incorporation Date: 03.05.1978
Company Type: Public
Independent
Quoted Status: Not
Quoted
Contents
· Industry Codes
· Business Description
Industry Codes
ANZSIC 2006 Codes:
3101 - Road and Bridge Construction
3109 - Other Heavy and Civil Engineering Construction
NACE 2002 Codes:
4521 - General construction of buildings and civil engineering
works
NAICS 2002 Codes:
237130 - Power and Communication Line and Related Structures
Construction
237990 - Other Heavy and Civil Engineering Construction
237310 - Highway, Street, and Bridge Construction
US SIC 1987:
1622 - Bridge, Tunnel, and Elevated Highway Construction
1629 - Heavy Construction, Not Elsewhere Classified
1623 - Water, Sewer, Pipeline, and Communications and Power Line
Construction
UK SIC 2003:
45213 - Construction of civil engineering constructions
Undertakes work in
the field of hydropower, tunnelling, water and waste
water management as well as general construction work. ISO 9001:2008
Trading Terms
Purchasing Terms Cash, Credit (30 days)
Selling Terms Cash,
Credit (30 days)
Types of customers
Corporate
Bankers
· Standard Chartered Bank
Kathmandu, Nepal
Auditors
M. Amatya & company
Chartered Accountants
Name of
shareholder Percentage
Government of Nepal (Ministry of Energy) (11%)
United Mission to Nepal (11%)
Nepal Jalabidyut Prabardhan tatha Bikas Limited (78%)
(Amt.
In Nepalese Rupee)
|
Particulars
|
31.03.2011 |
31.03.2010 |
|
Sales Turnover |
22 Crores |
19 Crores |
|
Board of
Directors |
|
|
|
|
||
|
P. Srestha |
Director |
|
|
||
|
S. Sharma |
Director |
|
|
||
|
S K Shrestha |
Director |
|
|
||
|
D B Singh |
Director |
|
|
||
|
M P Sharma |
Director |
|
|
||
|
David Mcconkey |
Director |
|
|
|
Executives |
|
|
|
|
|||
|
Manager of Finance |
Finance Executive |
|
Current Projects
· Mai Hydropower Project (22 MW)
· Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW)
· Tila-1 and Tila-2 Hydropower Project – Drifting and Core Drilling
· Bhairabkunda Small Hydroelectric Project (3.0 MW)
· Upper Seti Storage Hydroelectric Project (127 MW) – Test Adits
· Upper Karnali Hydroelectric Project (300 MW) – Exploratory Drift
· Dhanusha – Mahottari Transmission Line (33, 11, 0.4 kV)
· Maintenance of 132 kV Lines of Upper Bhotekoshi Hydel Project (36 MW)
· Khimti Dhalkebar 220 kV Transmission Line
· Our International Valued Clients
· British Columbia Hydro International (BCHI), Vancouver, Canada
· British Embassy in Kathmandu, Nepal
· China International Water & Electric Corp. (CWE), China
· Dywidag-Dragados-CWE JV (DDC JV)
· Dr. Christian F Uhlir, Viena, Austria
· GMR Group, India
· Hyundai Engineering & Construction Co. Ltd., Seoul, Korea
· Impregilo S.p.A., Italy
· Kalpataru Power Transmission Limited, Gujarat, India
· Lahmeyer International GmbH, Germany
· Larsen & Toubro Limited (L&T), India (Engineering Construction & Contracts Division)
· MT Højgaard, Denmark
· NCC Tunnelling (formerly Statkraft Anlegg AS), Norway
· Nippon Koei Co. Ltd., Tokyo, Japan
· Norconsult AS, Norway
· Royal Norwegian Embassy in Kathmandu, Nepal
· Siri Ram Syal & Sons Constructions Pvt Ltd., New Delhi, India
· Wartsila Diesel, Finland
National Valued
Clients
· Anandaban Leprosy Hospital, Lalitpur
· Annapurna Renewable Energy Pvt Ltd, Kathmandu
· Bagmati Watershed Project, Kathmandu
· Bhairabkunda Hydropower Pvt. Ltd.
· Bhote Koshi Power Company
· Butwal Plywood Factory (Pvt) Ltd., Butwal
· Butwal Power Company (BPC) Limited, Kathmandu
· Chilime Hydropower Company Limited
· Department of Hydrology and Meteorology, Government of Nepal
· Department of Water Supply and Sanitation, Government of Nepal
· East Nepal Development Endeavor Pvt Ltd, Kathmandu
· GMR Upper Karnali Hydropower Ltd.
· Himal Dolakha Hydropower Company Ltd, Lalitpur
· Himal Power Limited, Lalitpur
· Himalayan Power Consultants, Kathmandu
· Himtal Hydropower Company Pvt Ltd
· Hydro Lab Pvt. Ltd, Lalitpur
· Irrigation Department, Government of Nepal
· Joint Venture Arun 3 Consulting Services
· Khudi Hydro Power Ltd
· Lamjung Electricity Development Company, Lamjung
· Lumbini Sugar Mills Ltd., Sunwal
· Manakamana Darshan (P.) Ltd., Kathmandu
· Marsyangdi Hydro-electric Development Board, Government of Nepal
· Nepal Electricity Authority, Kathmandu
· Nepal Engineers’ Association, Lalitpur
· Nepal Hydro & Electric Limited, Kathmandu
· Nepal Jalbidyut Prabardan Tatha Bikas Ltd., Lalitpur
· Patan Hospital, Lalitpur
· Rairang Hydropower Development Company (Pvt) Ltd., Lalitpur
· Sanima Hydro Power (P) Ltd
· S.C. Power Company Pvt. Ltd
· Sapta Gandaki Project Survey Team, Dica
· Shiva Shree Hydropower Pvt Ltd, Kathmandu
· Small Hydel Development Board, Government of Nepal
· Tila Karnali Hydroelectric Co. Pvt. Ltd.
· Tansen Mission Hospital, Tansen, Palpa
· United Mission to Nepal
· Upper Bhotekoshi Hydropower Company Pvt Ltd., Sindhupalchowk, Nepal
Projects
Current Projects
· Mai Hydropower Project (22 MW)
· Andhikhola Hydropower Project (Upgrading 5.1 to 9.4 MW))
· Tila-1 and Tila-2 Hydropower Project – Drifting and Core Drilling
· Bhairabkunda Small Hydroelectric Project (3.0 MW)
· Upper Seti Storage Hydroelectric Project (127 MW) – Test Adits
· Upper Karnali Hydroelectric Project (300 MW) – Exploratory Drift
· Survey and Feasibility Study of Super Madi Hydroelectric Project (44 MW), Kaski, Nepal
· Survey and Feasibility Study of Middle Modi Hydroelectric Project (15 MW), Kaski, Nepal
· Dhanusha – Mahottari Transmission Line (33, 11, 0.4 kV)
· Maintenance of 132 kV Lines of Upper Bhotekoshi Hydel Project (36 MW)
·
Khimti Dhalkebar 220 kV Transmission Line
Completed Projects
· Hydropower Projects and Tunnelling:
· Arun III Hydro-Electric Project – Test Adits
· Andhikhola Hydel & Rural Electrification Project (5.1 MW)
· Baglung Small Hydel Project (0.2 MW), Baglung
· Doti Hydel Project, Doti – Tunnel
· Jhimruk Hydro-Electric & Rural Electrification Project (12MW)
· Karnali Multipurpose Project – Test Adits
· Khimti I Hydropower Project (60 MW)
· Khudi Hydropower Project (4 MW), Lamjung
· Khudi Hydropower Project Civil Repair Works (Damaged by the Flood)
· Marsyangdi Hydro Electric Project – Test Adits
· Melamchi Diversion Scheme (Bankable Feasibility Study – Likhu Adit)
· Middle Marsyangdi Hydroelectric Project (Parts of the works), Lamjung
· Modikhola Hydropower Project (14 MW)
· Sapta Gandaki Hydro Electric Project -Test Adits
· Sunkoshi Small Hydropower Project (2.6 MW)
· Surnaya Gadh Irrigation Project – Tunnel
· Syangja Small Hydel Project (80 KW), Syangja
· Tatopani Small Hydel Project (2 MW)
· Tinau Hydropower Project (1 MW), Butwal
· Tinau Hydropower Project (1 MW), Butwal – Repair Works
· Upper Marsyangdi II Hydroelectric Project – Exploratory Drift
· Upper Tamakoshi Hydro Electric Project – Access Tunnel to Powerhouse
· Upper Tamakoshi Hydro Electric Exploration Tunnel Project
· Survey, Review and Design Works for Various Hydropower Projects
Water &
Wastewater Management:
· Operation of Hetauda Drainage and Wastewater Management Project, Hetauda, Makawanpur
· Hetauda Drainage and Wastewater Management Project, Hetauda
· Bandipur Water Supply and Sanitation Project, Tanahu
· Beni Water Supply and Sanitation Project, Myagdi
· Bijuwar Water Supply and Sanitation Project, Pyuthan
Irrigation:
· Praganna Kulo Irrigation Project, Deukhuri, Dang
General
Construction:
· Biratnagar Multifuel Power Plant (13 MW)
· Butwal Plywood Factory, Butwal – Construction of Office
· Hydro Lab (P.) Ltd – Office Building
· Jiri Substation Civil works33/11 KV, 1.5 MVA , Dolakha
· Nepal Hydro & Electric – Office & Workshop Buildings, Butwal
· Nepal Hydro & Electric – Heavy Structural Workshop Building, Butwal
· Patan Hospital Extension Project, Lalitpur
· Patan Hospital Staff Quarters, Lalitpur
· Road and Bridges (Nayapul – Kirne Road)
· Tansen Hospital Staff Quarters, Tansen, Palpa
· Tsho Rolpa GLOF Risk Reduction Project
Transmission Line:
· Andhikhola Hydel & Rural Electrification Project, Syangja (66, 33, 1, 0.4 kV)
· Chilime 132 KV Transmission Line
· Jhimruk Hydro Electric & Rural Electrification Project, Pyuthan Pyuthan (132, 33, 0.4 kV)
· Khimti I Hydropower Project, Dolakha (33 kV)
· Modikhola Hydroelectric Project, Patichhaur, Parvat (132 kV)
· Rerouting, Erection and Stringing of Kusaha-Kataiya 132 kV TL
· Rerouting of Gajuri 132 KV TL (Section T# 128 – 130)
· Sunkoshi Lamosangu 33 KV Transmission Line
Ropeway:
· Manakamana Cable Car Project, Kurintar, Chitwan
· Material Ropeway – JHEREP, Pyuthan
· Material/Passenger Ropeway – KHP – I, Dolakha
· Design Study of Various Ropeways
Services
Area of
Specialization
Other Services
· Ropeway
· Water & Wastewater Management
· Building
· Equipment Rental & Maintenance
Hydropower
Development
Optimum realisation of natural resources is a
key to the economic growth of the country.
Nepal has huge potential for hydropower development and there is a great
need of power as the country makes progress towards industrialization.
Moreover, a vast market in the neighboring country makes it possible to export
the surplus Nepal can generate. But funding hydropower projects is a major
obstacle.
Experience shows that until and unless local resource and local
capability is used to the fullest extent we can never get affordable power nor
will we be able to export it to our neighbors. Given the opportunity, a company
like Subject could play a major role in the development of affordable hydropower
in Nepal. Subject has repeatedly proven it can successfully complete major and
daring construction.
In last 30 years, Subject has pioneered and led the hydropower
construction sector in Nepal. With this experience, Subject looks forward to
develop hydropower projects. Subject is going to emerge as a Hydropower
Developer in recent future. Subject has obtained Survey licenses for
Electricity Generation of some Hydropower Projects and their feasibility
studies are being carried out. One of the Hydropower Projects under feasibility
study is Super Madi Hydroelectric Project, which will have 44
MW installed capacity. Subject is also actively involved in the development
process of Middle Modi Hydroelectric Project of 15 MW installed
capacity.
Any investment from Subject will generally be through our involvement in
the construction of the project. Subject’s contribution could be in the form of
cash investment, deferred payment for the part of the work done or conversion
of part of the construction to shares.
FOREIGN EXCHANGE RATES
|
Currency |
Unit
|
Indian Rupees |
|
US Dollar |
1 |
Rs.52.72 |
|
UK Pound |
1 |
Rs.82.71 |
|
Euro |
1 |
Rs.68.90 |
RATING EXPLANATIONS
|
RATING |
STATUS |
PROPOSED CREDIT LINE |
|
|
>86 |
Aaa |
Possesses an extremely sound financial base with the strongest capability
for timely payment of interest and principal sums |
Unlimited |
|
71-85 |
Aa |
Possesses adequate working capital. No caution needed for credit
transaction. It has above average (strong) capability for payment of interest
and principal sums |
Large |
|
56-70 |
A |
Financial & operational base are regarded healthy. General unfavourable factors will not cause fatal effect.
Satisfactory capability for payment of interest and principal sums |
Fairly Large |
|
41-55 |
Ba |
Overall operation is considered normal. Capable to meet normal
commitments. |
Satisfactory |
|
26-40 |
B |
Capability to overcome financial difficulties seems comparatively
below average. |
Small |
|
11-25 |
Ca |
Adverse factors are apparent. Repayment of interest and principal sums
in default or expected to be in default upon maturity |
Limited with
full security |
|
<10 |
C |
Absolute credit risk exists. Caution needed to be exercised |
Credit not
recommended |
|
---- |
NB |
New Business |
---- |
This score serves as a reference to assess SC’s credit risk
and to set the amount of credit to be extended. It is calculated from a
composite of weighted scores obtained from each of the major sections of this report.
The assessed factors and their relative weights (as indicated through %) are as
follows:
Financial
condition (40%) Ownership
background (20%) Payment
record (10%)
Credit history
(10%) Market trend
(10%) Operational
size (10%)
This report is issued at your request without any risk
and responsibility on the part of MIRA INFORM PRIVATE LIMITED (MIPL) or its
officials.