1. Summary Information

 

 

Country

India

Company Name

KEC INTERNATIONAL LIMITED

Principal Name 1

Mr. H. V. Goenka

Status

Good

Principal Name 2

Mrs. Sobha Singh Thakur

 

 

Registration #

11-152061

Street Address

RPG House, 463, Dr. Annie Besant Road, Worli, Mumbai – 400030, Maharashtra, India

Established Date

18.03.2005

SIC Code

--

Telephone#

91-22-66972777/ 28204045/ 66670200/ 66670297

Business Style 1

Manufacturers

Fax #

91-22-66972799/ 28204052/ 66670299/ 66670287/ 66670260

Business Style 2

--

Homepage

http://www.kecrpg.com

Product Name 1

Transmission Line Tower

# of employees

4800 (Approximately)

Product Name 2

--

Paid up capital

Rs. 514,177,000/-

Product Name 3

--

Shareholders

Shareholding of Promoter and Promoter Group – 47.71%

Public shareholding – 52.29%

Banking

Bank of India

Public Limited Corp.

YES

Business Period

8 years

IPO

YES

International Ins.

-

Public Enterprise

YES

Rating

Ba (52)

Related Company

Relation

Country

Company Name

CEO

Subsidiaries- wholly owned

Nigeria

RPG Transmission Nigeria Limited,

 

--

Note

-

 

2. Summary Financial Statement

Balance Sheet as of

31.03.2013

(Unit: Indian Rs.)

Assets

Liabilities

Current Assets

40000,908,000

Current Liabilities

30,564,049,000

Inventories

2855,015,000

Long-term Liabilities

9,765,113,000

Fixed Assets

8638,351,000

Other Liabilities

1,675,668,000

Deferred Assets

0,000

Total Liabilities

42,004,830,000

Invest& other Assets

276,811,000

Retained Earnings

9,252,078,000

 

 

Net Worth

9,766,255,000

Total Assets

51,771,085,000

Total Liab. & Equity

57,711,085,000

 Total Assets

(Previous Year)

45,476,016,000

 

 

P/L Statement as of

31.03.2013

(Unit: Indian Rs.)

Sales

55,920,770,000

Net Profit

45,584,000

Sales(Previous yr)

46,894,668,000

Net Profit(Prev.yr)

1,818,387,000

 
MIRA INFORM REPORT

 

 

Report Date :

26.11.2013

 

IDENTIFICATION DETAILS

 

Name :

KEC INTERNATIONAL LIMITED

 

 

Registered Office :

RPG House, 463, Dr. Annie Besant Road, Worli, Mumbai – 400030, Maharashtra

 

 

Country :

India

 

 

Financials (as on) :

31.03.2013

 

 

Date of Incorporation :

18.03.2005

 

 

Com. Reg. No.:

11-152061

 

 

Capital Investment / Paid-up Capital :

Rs. 514.177 Millions

 

 

CIN No.:

[Company Identification No.]

L45200MH2005PLC152061

 

 

TAN No.:

[Tax Deduction & Collection Account No.]

MUMK11457F

 

 

PAN No.:

[Permanent Account No.]

AAACK4279J

 

 

Legal Form :

A Public Limited Liability company. The company’s Share are Listed on the Stock Exchange.

 

 

Line of Business :

Manufacturer of Transmission Line Tower.

 

 

No. of Employees :

4800 (Approximately)

 

 

RATING & COMMENTS

 

MIRA’s Rating :

Ba (52)

 

RATING

STATUS

PROPOSED CREDIT LINE

41-55

Ba

Overall operation is considered normal. Capable to meet normal commitments.

Satisfactory

 

Maximum Credit Limit :

USD 39000000

 

 

Status :

Good

 

 

Payment Behaviour :

Regular

 

 

Litigation :

Exists

 

 

Comments :

Subject is a well established and reputed company having a good track record.

 

There appears drastic dip in the profitability during 2013.

 

However, general financial strength seems to be strong. Liquidity position is good.

 

Trade relations are reported to be fair. Business is active. Payments are reported to be regular and as per commitment.

 

The company can be considered for business dealings at usual trade terms and condition.

 

NOTES :

Any query related to this report can be made on e-mail : infodept@mirainform.com while quoting report number, name and date.

 

ECGC Country Risk Classification List – March 31st, 2013

 

Country Name

Previous Rating

(31.12.2012)

Current Rating

(31.03.2013)

India

A1

A1

 

Risk Category

ECGC Classification

Insignificant

 

A1

Low

 

A2

Moderate

 

B1

High

 

B2

Very High

 

C1

Restricted

 

C2

Off-credit

 

D

 

INDIAN ECONOMIC OVERVIEW

 

The current downturn provides an opportunity to push ahead with reforms to accelerate growth, says the latest India Development Update report released by the World Bank. The report says that the adverse effects of rupee depreciation are likely to be offset by the gains in the exports performance due to improved external competitiveness. Since May this year, the local currency has depreciated substantially and fell to a record level of Rs 68.85 to a dollar on August, 28.

 

A stagflation like situation appears to have arisen as inflation jumped to an eight month high of 6.46 % for the month of September. It is up from 6.10 % in August. Growth continues to be muted with factory output plunging to 0.6  % in August. Onion prices have risen nearly 300 % from last September. Vegetables cost nearly 90 % more than they did last year. Wake up to the economic contribution of slum dwellers. They contribute more than 7.5 % to the country’s gross domestic product, according to a recent study conducted in 50 top cities.

 

136000 estimated number of jobs created during the second quarter of the current financial year. 50000 estimated number of additional jobs in the field of corporate social responsibility in the coming years.

 

The International Finance Corporation expects to come out with its rupee linked bonds issue before the end of 2013 as a part of its plan to raise $ 1 billion. The Apple iPhone 5c (Rs 41900 for 16 GB variant) and 5s (Rs 53500 for 16GB variant) has been launched in India from 1st November.

 

The Land Acquisition Act to provide just and fair compensation to farmers will come into force from January 1 next year, said Rural Development Minister Jairam Ramesh. The Act replaces a 119 year old registration. The Securities and Exchange Board of India has approved the trading of currency futures on the Bombay Stock Exchange. The exchange plans to launch the currency futures platform with advanced trading technology by the end of November.

 

EXTERNAL AGENCY RATING

 

Rating Agency Name

ICRA

Rating

Long term fund based limits: A+

Rating Explanation

Have adequate degree of safety and carry low credit risk.

Date

July 2013

 

Rating Agency Name

ICRA

Rating

CP-backed by safety letter of comfort: A1+

Rating Explanation

Very strong degree of safety and carry lowest credit risk.

Date

July 2013

 

 

 

RBI DEFAULTERS’ LIST STATUS

 

Subject’s name is not enlisted as a defaulter in the publicly available RBI Defaulters’ list.

 

 

EPF (Employee Provident Fund) DEFAULTERS’ LIST STATUS

 

Subject’s name is not enlisted as a defaulter in the publicly available EPF (Employee Provident Fund) Defaulters’ list as of 31-03-2012.

 

INFORMATION PARTED BY

 

Name :

Mr. Aniket

Designation :

Legal Department

Contact No.:

91-22-66670200

 

 

LOCATIONS

 

Registered Office / International Transmission  :

1st Floor, RPG House, 463, Dr. Annie Besant Road, Worli, Mumbai – 400030, Maharashtra, India

Tel. No.:

91-22-66972777/ 28204045/ 66670200/ 66670297

Fax No.:

91-22-66972799/ 28204052/ 66670299/ 66670287/ 66670260

E-Mail :

kecindia@bom.keerpgmail.com

hm.singh@rpgkec.sprintrpg.ems.vsnl.net.in

hm.singh@rpgkec.sprin

raoj@kecrp.com

Website :

http://www.kecrpg.com

 

 

KEC Manufacturing

 

 

 

Factory 1 :

B-190, M.I.D.C. Industrial Estate, Butibori, Nagpur - 441108, Maharashtra, India

Tel. No.:

91-7104-662209

Fax No.:

91-7104-662251

E-Mail :

kecbutibori@kecrpg.com

 

 

Factory 2 :

Jhotwara, Jaipur – 302012, Rajasthan, India

Tel. No.:

91-141-2340214 / 91-141-6700201

Fax No.:

91-141-2340223

E-Mail :

kecjaipur@kecrpg.com

 

 

Factory 3 :

Deori, P. O. Panagarh, Jabalpur – 483220, Madhya Pradesh, India

Tel. No.:

91-761-2350024

Fax No.:

91-761-2350204

E-Mail :

kecjabalpur@kecrpg.com

 

 

Factory 4 :

2nd Pokhran Road, P. B. No. 11, Thane - 400601, Maharashtra, India

Tel. No.:

91-022-21731706

Fax No.:

91-022-21731700

E-Mail :

aarora@rpgcables.com

 

 

Factory 5 :

349, Hebbal Industrial Area, Hootagalli, Belavadi Post, Mysore- 570016, India

Tel. No.:

91-821-6559937/6559938/6553181

Fax No.:

91-821-2402499

E-Mail :

dkrao@rpgcables.com

 

 

Factory 6 :

Plot No 273/4, Demni Road, Dadra, Silvassa-396191, United Territory, India 

Tel. No.:

91-260-2668518/2668519

Fax No.:

91-260-2268519

E-Mail :

santoshkadam@rpgcables.com

 

 

PLANTS TRANSMISSION

 

 

 

Factory 1 :

B-190, M.I.D.C. Industrial Estate, Butibori, Nagpur - 441108, Maharashtra, India

Tel. No.:

91-7104-662209

Fax No.:

91-7104-662251

E-Mail :

kecmanufacturing@kecrpg.com

 

 

Factory 2 :

Jhotwara, Jaipur – 302012, Rajasthan, India

Tel. No.:

91-141-2340214 / 91-141-6700201

Fax No.:

91-141-2340223

E-Mail :

kecjaipur@kecrpg.com

 

 

Factory 3 :

Deori, P. O. Panagarh, Jabalpur – 483220, Madhya Pradesh, India

Tel. No.:

91-761-2350024

Fax No.:

91-761-2350204

E-Mail :

kecjabalpur@kecrpg.com

 

 

Factory 4 :

Arco Vial Saltillo-nuevo laredo Km. 24.1 C.P. 66050-79 Escobedo, n. l. Mexico

 

 

Factory 5 :

R. Moacyr g. Costa, 15 - Jd. Piemont Sul 32669-722 - Betim / Mg, Brazil

 

 

CABLES

 

Factory 6:

Hebbal Industrial Area, Hootagalli, Belavadi Post, Mysore-571186, Karnataka, India

 

 

Factory 7:

2nd Pokhran Road, Post Box No. 11, Thane – 400601, Maharashtra, India

 

 

Factory 8:

Plot no. 273/4,  Demni Road, Silvassa – 396191, Dadra and Nagar Haveli, India

 

 

Factory 9:

Village: Godampura ( Samlaya) Taluka: Savli - - 391 520, Gujarat, India

 

 

Projects Locations :

South Asia Transmission :

DLF Infinity Towers, 7th Floor, Tower-'B', DLF City, Phase-II, Gurgaon-122002, Haryana, India

Phone: 91-124-4188777

Fax: 91-124-4188721

Email: kecdomestic@kecrpg.com

 

1st Floor, RPG House, 463, Dr. Annie Besant Road, Worli, Mumbai – 400030, Maharashtra, India

Phone: 91-22-666770200

E-mail: kecindia@kecrpg.com

 

6th Floor RPG House, 463 Dr. Annie Besant Road, Worli , Mumbai – 400025, Maharashtra, India

Tel: 91-22-66670300/66670305

Fax: 91-22-24930206/24930206

Power Division Email: sanjay.deosthali@rpgcables.com

Telecom Division Email: nandanan@rpgcables.com

Export Division Email: chatterjeet@rpgcables.com

 

Telecommunication:

KEC International Limited Telecom Division, "The Pavilion", 3rd Floor, 339/2, Mehrauli-Gurgaon Road, Opposite State Bank of India, Sector 14, Gurgaon-122001, Haryana, India

Phone:91-124-4607700
Fax:91-124-4607702

 

 

DIRECTORS

 

As on 31.03.2013

 

Name :

Mr. H. V. Goenka

Designation :

Chairman

Address :

14-16, Patazzo B. G. Khar Marg, Mumbai – 400008, Maharashtra, India

Qualification :

Arts Graduate and BA, MBA (Geneva)

Other Directorship :

Ø       Bayer (India) Limited

Ø       Zensar Technologies Limited

Ø       RPG Enterprises Limited

Ø       Raychem RPG Limited

Ø       RPG Cables Limited

Ø       RPG Paging Services Limited

Ø       PRG Life Sciences Limited

Ø       Spentex Industries Limited

Ø       CEAT Limited (Vice Chairman)

Ø       Bajaj Electricals

Ø       Zensar Technologies Inc.,

Ø       Sprint RPG India Limited

Ø       The State Industrial and Investments Corporation of Maharashtra Limited (SICOM)

 

 

Name :

Mr. R. D. Chandak

Designation :

Managing Director and Chief Executive Officer

Address :

B/44, Ruia Park, 47, J. R. Mahatro Road, Juhu, Mumbai – 400049, Maharashtra, India

Qualification :

M. Com., FCA

 

 

Name:

Mrs. Sobha Singh Thakur

Designation:

Director

Address:

1161, Abdul Court, Flat No. 20, Suryavanshi Marg, Dadar, Mumbai – 400028, Maharashtra, India

Qualification:

M. Com., CAIIB

 

 

Name:

Mr. Gulu Lalchand Mirchandani

Designation:

Director

Address:

22, Paras, Little Gibs Road, Malabar Hill, Mumbai – 400006, Maharashtra, India

Qualification:

B. Mechanical

 

 

Name :

Mr. Dilip G Piramal

Designation :

Director

 

 

Name :

Mr. Sharad Madhav Kulkarni

Designation :

Director

Qualification :

Bechelor of Engineering :

FIE (India) F Institute of Directors (UK) Fellow-Institute of Management (UK)

Other Directorship:

Ø       Sharvari Investment Private Limited

Ø       Spentex Industries Limited

Ø       Raychem RPG Limited

Ø       Bayer ABS Limited

Ø       Spencer International Hotels Limited

Ø       Bayer India Limited

Ø       Hindustan Construction Company Limited

Ø       RPG Enterprises Limited

Ø       Global Procurement Consultants Limited

Ø       Jubilee Investments and Industries Limited

Ø       Hilltop Holding India Limited

Ø       ATR Consulting Private Limited

Ø       Indiaco Com (Private) Limited

Ø       Travel Voyages (India) Limited

 

 

Name:

Mr. Ajit Teckchand Vaswani

Designation:

Director

Address:

502, Solitalre Hirandani Gardens, Powai, Mumbai – 400076, Maharashtra, India

Qualification:

CA, CS

 

 

Name:

Mr. Jotindra Mansukhlal Kothary

Designation:

Director

Address:

16 A, Thakur Niwas, 3rd Floor, 173, J. N. Tata Road, Churchgate, Mumbai – 400020, Maharashtra, India

Qualification:

B. Com LLB, MBA (USA)

 

 

Name :

Mr. P. A. Makwana

Designation :

Director

 

 

Name :

Mr. M. K. Sharma

Designation :

Director

 

 

Name :

Mr. S. M. Trehan

Designation :

Director

 

 

KEY EXECUTIVES

 

Name :

Mr. Ch. V. Jagannadha Rao

Designation :

Company Secretary

 

 

Name :

Mr. Vimal Kejriwal

Designation :

President – Transmission Business

 

 

Name :

Mr. Vardhan Vasant Dharkar

Designation :

Executive Director - Finance

 

 

Name :

Mr. Yugesh Goutam

Designation :

Senior Vice President – Human Resource

 

 

Name :

Mr. Nikhil Gupta

Designation :

Executive Director – Cables

 

 

Name :

Mr. Randeep Narang

Designation :

Executive Director - South Asia (Transmission)

 

 

Name :

Mr. Sanjay Chandra

Designation :

Chief Executive – Railways

 

 

Name :

Mr. Dilip Shukla 

Designation :

Chief Executive – Water

 

 

Name :

Mr. V. Balasubramanian

Designation :

Chief Executive - Renewable Energy

 

 

Name :

Mr. R.D. Chandak

Designation :

Managing Director and Chief Executive Officer

 

 

Name :

Mr. Aniket

Designation :

Legal Department

 

 

MAJOR SHAREHOLDERS / SHAREHOLDING PATTERN

 

As on 30.09.2013

 

Category of Shareholders

No. of Shares

Percentage of Holding

 

 

 

(A) Shareholding of Promoter and Promoter Group

 

 

http://www.bseindia.com/include/images/clear.gif(1) Indian

 

 

http://www.bseindia.com/include/images/clear.gifIndividuals / Hindu Undivided Family

4378270

1.70

http://www.bseindia.com/include/images/clear.gifBodies Corporate

118283887

46.01

http://www.bseindia.com/include/images/clear.gifSub Total

122662157

47.71

http://www.bseindia.com/include/images/clear.gif(2) Foreign

 

 

Total shareholding of Promoter and Promoter Group (A)

122662157

47.71

(B) Public Shareholding

 

 

http://www.bseindia.com/include/images/clear.gif(1) Institutions

 

 

http://www.bseindia.com/include/images/clear.gifMutual Funds / UTI

67461527

26.24

http://www.bseindia.com/include/images/clear.gifFinancial Institutions / Banks

6396944

2.49

http://www.bseindia.com/include/images/clear.gifInsurance Companies

10285225

4.00

http://www.bseindia.com/include/images/clear.gifForeign Institutional Investors

6008561

2.34

http://www.bseindia.com/include/images/clear.gifAny Others (Specify)

5480

0.00

http://www.bseindia.com/include/images/clear.gifForeign Bank

5480

0.00

http://www.bseindia.com/include/images/clear.gifSub Total

90157737

35.07

http://www.bseindia.com/include/images/clear.gif(2) Non-Institutions

 

 

http://www.bseindia.com/include/images/clear.gifBodies Corporate

10455794

4.07

http://www.bseindia.com/include/images/clear.gifIndividuals

 

 

http://www.bseindia.com/include/images/clear.gifIndividual shareholders holding nominal share capital up to Rs. 0.100 Million

27375666

10.65

http://www.bseindia.com/include/images/clear.gifIndividual shareholders holding nominal share capital in excess of Rs. 0.100 Million

3008104

1.17

http://www.bseindia.com/include/images/clear.gifAny Others (Specify)

3428912

1.33

http://www.bseindia.com/include/images/clear.gifNRIs/OCBs

1191944

0.46

http://www.bseindia.com/include/images/clear.gifClearing Members

450743

0.18

http://www.bseindia.com/include/images/clear.gifTrusts

1786185

0.69

http://www.bseindia.com/include/images/clear.gifDirectors & their Relatives & Friends

40

0.00

http://www.bseindia.com/include/images/clear.gifSub Total

44268476

17.22

Total Public shareholding (B)

134426213

52.29

Total (A)+(B)

257088370

100.00

(C) Shares held by Custodians and against which Depository Receipts have been issued

0

0.00

http://www.bseindia.com/include/images/clear.gif(1) Promoter and Promoter Group

0

0.00

http://www.bseindia.com/include/images/clear.gif(2) Public

0

0.00

http://www.bseindia.com/include/images/clear.gifSub Total

0

0.00

Total (A)+(B)+(C)

257088370

0.00

 

 

BUSINESS DETAILS

 

Line of Business :

Manufacturer of Transmission Line Tower.

 

 

Products :

Item Code No. (ITC Code)

730820.01

Product Description

Towers and Structural

 

Item Code No. (ITC Code)

730820.01

Product Description

Engineering, Procurement and Construction (EPC)

 

 

Terms :

 

Selling :

Credit

 

 

Purchasing :

Credit

 

 

GENERAL INFORMATION

 

Customers :

End Users

 

 

No. of Employees :

4800 (Approximately)

 

 

Bankers :

·         India

 

·         Bank of India

·         Abu Dhabi Commercial Bank

·         Allahabad Bank

·         Axis Bank Limited

·         Bank of Baroda

·         Barclays Bank Plc

·         Central Bank of India

·         Corporation Bank

·         Dena Bank

·         Export-import Bank of India

·         ICICI Bank Limited

·         IDBI Bank Limited

·         Punjab National Bank

·         Standard Chartered Bank

·         State Bank of Bikaner and Jaipur

·         State Bank of Hyderabad

·         State Bank of India

·         Syndicate Bank

·         The Royal Bank of Scotland N.V.

·         YES Bank limited

·         Kotak Mahindra Bank limited

·         Punjab and Sind Bank

·         The Dhanlaxmi Bank limited

 

·         U.S.

 

·         JP Morgan Chase Bank, N.A

·         Wells Fargo Bank, N.A.

 

·         Mexico

·         Banco Nacional de Mexico, S.A.

·         Grupo Financiero BBVA Bancomer

 

·         Brazil

 

·         HSBC Bank Brasil S/A

·         Banco Bradesco S/A

·         Banco Itau BBA S/A

·         Banco Santander S/A

 

 

Facilities :

Secured Loan

31.03.2013

(Rs. in Millions)

 

Long-term Borrowings

 

 

From banks

2674.198

 

Less : Current maturities of long-term debt

(876.836)

 

From others parties

1329.976

 

Less : Current maturities of long-term debt

(316.630)

 

Short-term borrowings

 

 

Loans repayable on demand

From banks

4362.307

 

Other short term borrowings

 

 

From banks

2094.998

 

From other parties

497.100

 

Total

9765.113

 

 

Secured Loan

As on

31.03.2012

(Rs. in

Millions)

Loans repayable on demand

From banks

 

767.536

Other Short term Borrowings

From Banks                                         

From other Parties

 

1978.822

500.000

Total

3246.358

 

 

Note:

 

LONG-TERM BORROWINGS

 

Term loans from banks :

 

(a)  Rs.839.550 Millions (Previous Year Rs.839.550 Millions) secured by first charge on movable assets of Telecom Division including Telecom Towers, both present and future. The term loan is repayable in 12 equal quarterly installments commencing from April 24, 2013 and carries interest rate of 7.25% p.a.

 

(b)  Rs.583.156 Millions (Previous Year Rs.916.700 Millions) secured by way of first charge on fixed assets situated at Thane and Mysore. The term loan is repayable in remaining 7 equal quarterly installments by December 9, 2014 and the present interest rate is 11.75 % p.a.

 

(c)  Rs.126.000 Millions (Previous Year Rs.294.000 Millions) secured by way of first charge on land, building and plant and machinery situated at Jaipur. The term loan is repayable in remaining 3 equal quarterly installments by December 31, 2013 and carries interest rate of 10.25% p.a.

 

(d)  Rs.285.492 Millions (Previous Year Rs.400.000 Millions) secured by first charge on movable fixed assets i.e. construction equipment pertaining to the Transmission, Distribution and Railway business situated at various project sites in India, both present and future. The term loan is repayable in remaining 10 equal quarterly installments by September 27, 2015 and the present interest rate is 10.75% p.a.

 

(e)  Rs.370.000 Millions (Previous Year Rs.NIL) collaterally secured by first charge to be created on land, building and plant and machinery situated at Thane and Mysore. The term loan is repayable in 13 quarterly structured installments commencing from March 31, 2015 and the present interest rate is 10.50% p.a.

 

(f)  Rs.470.000 Millions (Previous Year Rs.NIL) secured by first charge to be created on land, building and plant and machinery situated at Nagpur and Jabalpur factories. The term loan is repayable in 20 quarterly structured installments commencing from December 28, 2013 and the present interest rate is 10.85% p.a.

 

(g)  Rs.NIL (Previous Year Rs.0.032 Million) secured by hypothecation of vehicles.

 

Term loans from other parties includes :

 

(a)   Rs.296.154 Millions (Previous Year Rs.350.000 Millions) secured by first charge over the fixed assets pertaining to Tower Testing Station situated at Nagpur both present and future. The term loan is repayable in remaining 11 equal quarterly installments by December 09, 2015. The term loan of Rs.169.232 Millions and Rs. 126.922 Millions carry interest of 10% p.a. and 12.25% p.a. respectively.

 

(b)  Rs.0.344 Million (Previous Year Rs.0.714 Million) secured by hypothecation of vehicles. Out of these, the term loan of Rs.0.077 Million is repayable in remaining 5 equal monthly installments by August 03, 2013, Rs. 0.042 Million is repayable in remaining 5 equal monthly installments by August 09, 2013 and Rs.0.225 Million is repayable in remaining 21 equal monthly installments by December 11, 2014 and carry interest rate of 13.20 % p.a.

 

(c)  Rs.1033.478 Millions (Previous Year Rs.740.000 Millions) secured by exclusive first charge on the project assets including immovable properties at Cable factory, Vadodara both present and future. The term loan is repayable in remaining 20 equal quarterly installments by March 20, 2018 and the present interest rate is 11.33% p.a

 

SHORT-TERM BORROWINGS

 

Loans repayable on demand from banks :

 

(a)  Rs.3773.919 Millions (Previous Year Rs.564.056 Millions) secured by first charge by hypothecation of all the present and future current assets of the Company excluding those covered under Note 4.1 (a) above and second charge on the

Company’s fixed assets situated at Jaipur, Jabalpur and Nagpur factories. The present interest rates are in the range of 10% to 16% p.a.

 

(b)  Rs.348.843 Millions (Previous Year Rs.203.480 Millions) guaranteed by banks, which in turn is secured by security, stated against Note 7.1 (a) above. The present interest rate is 3.00% to 3.50% p.a.

 

(c)  Rs.239.545 Millions (Previous Year Rs.NIL) secured by assignment of certain overseas book debts. The present interest rate is 3.64% p.a.

 

Other short-term borrowings

 

(a)   From Banks

 

(i)  Rs.705.575 Millions (Previous Year Rs.401.852 Millions) secured by security stated against Note 7.1 (a) above. The present interest rates are in the range of 3% to 4% p.a.

 

(ii)  Rs.250.000 Millions (Previous Year Rs.NIL) being commercial paper issued against standby facility from a bank which in turn is secured by security stated against Note 7.1 (a) above and it carries rate of interest of 9.70% p.a.

Maximum balance outstanding any time during the year is Rs. 500.000 Millions (Previous Year Rs. 12500.000 Millions)

 

(iii)  Rs.1139.423 Millions (Previous Year Rs. 1576.970 Millions) secured by security stated against Note 7.1 (b) above. The present interest rates are in the range of 3% to 4% p.a.

 

(b)   From other parties

 

Rs. 497.100 Millions (Previous Year Rs.500.000 Millions) secured by security stated against Note 7.1 (a) above. The present interest rates are in the range of 4.00% to 10.50% p.a.

 

 

 

Banking Relations :

 

 

 

Auditors :

 

Name :

Deloitte Haskin and Sells

Chartered Accountants

Address :

Mumbai, Maharashtra, India

 

 

Subsidiaries- wholly owned:

·         RPG Transmission Nigeria Limited, Nigeria

·         KEC Global FZ – LLC, Ras UL Khaimah

·         Jay Railway Projects Private Limited

·         KEC Investment Holdings, Mauritius

·         KEC Global Mauritius, Mauritius

·         KEC International Holdings LLC, USA

·         KEC Brazil LLC, USA

·         KEC Mexico LLC, USA

·         KEC Transmission LLC, USA

·         KEC US LLC, USA

·         SAE Towers Holdings, LLC, USA

·         SAE Towers Brazil Subsidiary Company LLC, USA

·         SAE Towers Mexico Subsidiary Holding Company LLC, USA

·         SAE Towers Mexico S de RL de CV, Mexico

·         SAE Towers Brazil Torres de Transmission Ltda, Brazil

·         SAE Prestadora de Servicios Mexico, S de RL de CV, Mexico

·         SAE Towers Ltd, USA

·         SAE Towers Panama Holdings LLC, USA

·         SAE Towers Panama S de RL, Panama

·         SAE Engenharia E Construcao Ltda, Brazil (Incorporated on October 29, 2012)

·         KEC Power India Private Limited (Status changed from Joint Venture to Subsidiary w.e.f. March 31, 2012)

 

 

Subsidiaries:

·         RPG Transmission Nigeria Limited, Nigeria

·         KEC Global FZ – LLC, Ras UL Khaimah

·         Jay Railway Projects Private Limited

·         KEC Investment Holdings, Mauritius

·         KEC Global Mauritius, Mauritius

·         SAE Towers Holdings, LLC, USA

·         KEC Power India Private Limited (Status changed from Joint Venture to Subsidiary w.e.f. March 31, 2012)

·         SAE Towers Mexico S de RL de CV, Mexico

 

 

Joint ventures:

·         Al-Sharif Group and KEC Limited, Company, Saudi Arabia (formerly known as Faiz Abdul Hakim Al-Sharif Group

·         and KEC Company Limited Saudi Arabia)

·         KEC Power India Private Limited (Status changed from Joint Venture to Subsidiary w.e.f. March 31, 2012)

·         EJP KEC Joint Venture, South Africa

·         KEC – ASSB JV, Malaysia

·         KEC – ASIAKOM – UB JV

·         KEC – ASIAKOM JV

·         KEC – JEI JV

·         KEC – DELCO – VARAHA JV

·         KEC – VARAHA – KHAZANA JV

·         KEC – VALECHA – DELCO JV

·         KEC – SIDHARTH JV

·         KEC – TRIVENI – KPIPL JV

·         KEC – UNIVERSAL JV

·         KEC – DELCO – DUSTAN JV

·         KEC – ANPR – KPIPL JV

·         KEC – PLR – KPIPL JV

·         KEC – BJCL JV

·         KEC – KIEL JV

 

 

CAPITAL STRUCTURE

 

As on 31.03.2013

 

Authorised Capital :

 

No. of Shares

Type

Value

Amount

 

 

 

 

55,00,00,000

Equity Shares

Rs. 2/- each

Rs. 1100.000 Millions

1500000

Redeemable Preference Shares

Rs. 100/- each

Rs. 150.000 Millions

 

Total

 

Rs. 1250.000 Millions

 

Issued, Subscribed & Paid-up Capital :

 

No. of Shares

Type

Value

Amount

 

 

 

 

257088370

Equity Shares

Rs. 2/- each

Rs. 514.177 Millions

 

 

 

 

 

Note:

 

Reconciliation of number of equity Shares and amount outstanding at the beginning and at the end of the year

 

Equity Shares:

Nos.

Rs. in millions

Outstanding at the beginning of the year

2,57,088,370

514.177

Add : a) Shares issued during the year

--

--

Outstanding as at the end of the year

2,57,088,370

514.177

 

Shareholders holding more than 5% equity Shares in the company as at the end of the year

 

Name of the shareholder

Nos. of Shares Held

Percentage of shares held

Swallow Associates Limited *#

6,57,74,210

25.58

Summit Securities Limited *

2,51,78,520

9.79

HDFC Trustee Company Limited A/c HDFC Balanced Fund (AAATH1809A)

2,32,82,899

9.06

Life Insurance Corporation of India (AAACL0582H)

1,52,13,235

5.92

Instant Holdings Limited *@

1,45,46,968

5.66

Reliance Capital Trustee Co. Ltd. A/c Reliance

Diversified Power Sector Fund (AAATR0090B)

1,37,53,280

5.35

 

#Swallow Associates Limited has been converted into a Limited Liability Partnership w.e.f. October 31, 2012 and thereafter is known as Swallow Associates LLP.

 

@ Includes 836,750 shares held by Idea Tracom Private Limited which got merged with Instant Holdings Limited vide Scheme of Amalgamation which became effective on May 15, 2012.

 

*Shares held in Multiple Folios have been combined.

10,365,340 (Previous Year 68,659,100) Equity Shares of Rs.2 each were allotted as fully paid up pursuant to contracts without payment being received in cash, during the period of five years immediately preceding the balance sheet date.

 

Particulars

Current Year Nos.

Equity Shares of Rs.2 each allotted in 2010-11 to the shareholders

of the erstwhile RPG Cables Limited pursuant to the Scheme of

Amalgamation.

1,03,65,340

Equity Shares of Rs.2 each allotted in 2007-08 to the shareholders of

the erstwhile RPG Transmission Limited (RPGT) and the erstwhile

National Information Technologies Limited pursuant to the Scheme of

Arrangement

--

TOTAL

1,03,65,340

 

3,750 fully paid up Equity Shares of Rs.2 each were allotted to a trustee against 1,688 equity shares of RPGT, since merged in the Company in 2007-08, where rights were kept in abeyance under section 206A(b) of the Companies Act, 1956 by RPGT. On settlement of the relevant court cases/issues, the Equity Shares issued to the trustee will be transferred.

 

The Company has only one class of Equity Shares having a face value of Rs.2 each. Every member shall be entitled to be present, and to speak and vote and upon a poll the voting right of every member present in person or by proxy shall be in proportion to his share of the paid-up equity share capital of the Company. The Company in General Meeting may declare dividends to be paid to members according to their respective rights, but no dividends shall exceed the amount recommended by the Board, but the Company in General Meeting may declare a smaller dividend.

 

In the event of liquidation of the Company, the holders of Equity Shares will be entitled to receive remaining assets of the Company, after distribution of all preferential amounts.


 

FINANCIAL DATA

[all figures are in Rupees Millions]

 

ABRIDGED BALANCE SHEET

 

SOURCES OF FUNDS

 

 

 

31.03.2013

I.        EQUITY AND LIABILITIES

 

 

 

(1)Shareholders' Funds

 

 

 

(a) Share Capital

 

 

514.177

(b) Reserves & Surplus

 

 

9252.078

(c) Money received against share warrants

 

 

0.000

 

 

 

 

(2) Share Application money pending allotment

 

 

0.000

Total Shareholders’ Funds (1) + (2)

 

 

9766.255

 

 

 

 

(3) Non-Current Liabilities

 

 

 

(a) long-term borrowings

 

 

2810.708

(b) Deferred tax liabilities (Net)

 

 

804.220

(c) Other long term liabilities

 

 

100.000

(d) long-term provisions

 

 

97.905

Total Non-current Liabilities (3)

 

 

3812.833

 

 

 

 

(4) Current Liabilities

 

 

 

(a) Short term borrowings

 

 

6954.405

(b) Trade payables

 

 

22263.202

(c) Other current liabilities

 

 

8200.847

(d) Short-term provisions

 

 

773.543

Total Current Liabilities (4)

 

 

38191.997

 

 

 

 

TOTAL

 

 

51771.085

 

 

 

 

II.      ASSETS

 

 

 

(1) Non-current assets

 

 

 

(a) Fixed Assets

 

 

 

(i) Tangible assets

 

 

7122.869

(ii) Intangible Assets

 

 

1515.482

(iii) Capital work-in-progress

 

 

213.064

(iv) Intangible assets under development

 

 

0.000

(b) Non-current Investments

 

 

63.747

(c) Deferred tax assets (net)

 

 

0.000

(d)  Long-term Loan and Advances

 

 

1173.950

(e) Other Non-current assets

 

 

858.103

Total Non-Current Assets

 

 

10947.215

 

 

 

 

(2) Current assets

 

 

 

(a) Current investments

 

 

0.000

(b) Inventories

 

 

2855.015

(c) Trade receivables

 

 

26226.632

(d) Cash and cash equivalents

 

 

618.986

(e) Short-term loans and advances

 

 

4767.835

(f) Other current assets

 

 

6355.402

Total Current Assets

 

 

40823.870

 

 

 

 

TOTAL

 

 

51771.085

 

SOURCES OF FUNDS

 

 

31.03.2012

31.03.2011

SHAREHOLDERS FUNDS

 

 

 

1] Share Capital

 

514.177

514.177

2] Share Application Money

 

0.000

0.000

3] Reserves & Surplus

 

9478.434

8135.922

4] (Accumulated Losses)

 

0.000

0.000

5] Equity Share Suspense

 

0.000

0.000

NETWORTH

 

9992.611

8650.099

LOAN FUNDS

 

 

 

1] Secured Loans

 

3246.358

5883.144

2] Unsecured Loans

 

2770.253

2690.980

TOTAL BORROWING

 

6016.611

8574.124

DEFERRED TAX LIABILITIES

 

666.120

579.505

 

 

 

 

TOTAL

 

16675.342

17803.728

 

 

 

 

APPLICATION OF FUNDS

 

 

 

 

 

 

 

FIXED ASSETS [Net Block]

 

6993.133

7017.289

Capital work-in-progress

 

1076.861

193.432

Advances for capital expenditure

 

0.000

0.000

 

 

 

 

INVESTMENT

 

62.113

53.649

DEFERREX TAX ASSETS

 

0.000

0.000

 

 

 

 

CURRENT ASSETS, LOANS & ADVANCES

 

 

 

 

Inventories

 
3180.153

2128.839

 

Sundry Debtors

 
22142.418

20440.859

 

Cash & Bank Balances

 
941.285

596.144

 

Other Current Assets

 
6229.687

5801.967

 

Loans & Advances

 
4850.366

4002.646

Total Current Assets

 
37343.909

32970.455

Less : CURRENT LIABILITIES & PROVISIONS

 
 

 

 

Sundry Creditors

 
18813.323

15548.346

 

Other Current Liabilities

 
9036.325

6208.721

 

Provisions

 
951.026

674.030

Total Current Liabilities

 
28800.674

22431.097

Net Current Assets

 
8543.235

10539.358

 

 

 

 

MISCELLANEOUS EXPENSES

 

0.000

0.000

 

 

 

 

TOTAL

 

16675.342

17803.728

 

 

PROFIT & LOSS ACCOUNT

 

 

PARTICULARS

31.03.2013

31.03.2012

 

31.03.2011

 

SALES

 

 

 

 

 

Revenue from operations

55920.770

46043.338

39651.173

 

 

Other Income

206.414

851.330

41.914

 

 

TOTAL                                    

56127.184

46894.668

39693.087

 

 

 

 

 

Less

EXPENSES

 

 

 

 

 

Cost of materials consumed

30963.122

25099.319

20276.205

 

 

Changes in inventories of finished goods, work-in-progress and scrap

(45.734)

(183.003)

99.833

 

 

Erection and Subcontracting Expenses

13518.645

10826.098

9167.761

 

 

Employee Benefit Expenses

2891.081

2417.922

2002.820

 

 

Other Expenses

6282.725

4478.850

4275.751

 

 

TOTAL                                    

53609.839

42639.186

35822.370

 

 

 

 

 

Less

PROFIT BEFORE INTEREST, TAX, DEPRECIATION AND AMORTISATION

2517.345

4255.482

3870.717

 

 

 

 

 

Less

FINANCIAL EXPENSES            

1648.063

1337.066

1052.971

 

 

 

 

 

 

PROFIT BEFORE TAX, DEPRECIATION AND AMORTISATION                                              

869.282

2918.416

2817.746

 

 

 

 

 

Less/ Add

DEPRECIATION/ AMORTISATION                    

430.550

360.485

344.910

 

 

 

 

 

Less

EXCEPTIONAL ITEMS

1.376

9.783

84.900

 

 

 

 

 

 

PROFIT BEFORE TAX

437.356

2548.148

2387.936

 

 

 

 

 

Less

TAX                                                     

391.772

729.761

917.035

 

 

 

 

 

 

PROFIT AFTER TAX

45.584

1818.387

1470.901

 

 

 

 

 

Add

PREVIOUS YEARS’ BALANCE BROUGHT FORWARD

6470.889

5192.894

4226.445

 

 

 

 

 

Less

APPROPRIATIONS

 

 

 

 

 

Transfer to General Reserve

45.600

181.839

147.090

 

 

Dividend on Equity Shares

150.300

308.506

308.506

 

 

Tax on distributed profits

NA

50.047

48.856

 

BALANCE CARRIED TO THE B/S

NA

6470.889

5192.894

 

 

 

 

 

 

EARNINGS IN FOREIGN CURRENCY

 

 

 

 

 

Export of goods calculated on F.O.B. basis

7568.151

76113.23

4438.048

 

 

Freight recovered on sales

597.782

370.969

0.000

 

 

Tower testing charges and design charges

70.264

250.667

11.866

 

 

Sales and Services : overseas projects

17273.556

11854.397

13269.857

 

 

Interest income

3.651

0.489

0.214

 

 

Dividend income from a wholly owned subsidiary

40.45

272.189

0.00

 

 

Guarantee Charges received from a wholly owned subsidiary/joint

venture

55.547

0.000

0.000

 

 

Others (Insurance claims, etc.)

12.403

16.307

1.535

 

TOTAL EARNINGS

25621.804

88878.248

17721.520

 

 

 

 

 

 

IMPORTS

 

 

 

 

 

Raw Materials and components

3105.956

2567.117

1331.321

 

 

Spares parts / Dies and tools

35.059

47.292

43.910

 

 

Purchase of capital goods

363.884

539.396

131.020

 

TOTAL IMPORTS

3504.899

3153.805

1506.251

 

 

 

 

 

 

Earnings Per Share (Rs.)

 

 

 

 

Basic

0.18

7.07

5.72

 

Diluted

0.18

7.07

5.72

 

QUARTERLY RESULTS

 

PARTICULARS

 

30.06.2013

Audited / UnAudited

UnAudited

Net Sales

14525.500

Total Expenditure

13917.700

PBIDT (Excl OI)

607.800

Other Income

119.300

Operating Profit

727.100

Interest

519.100

Exceptional Items

(181.600)

PBDT

26.400

Depreciation

133.100

Profit Before Tax

(106.700)

Tax

(12.200)

Provisions and contingencies

0.000

Profit After Tax

(94.500)

Extraordinary Items

0.000

Prior Period Expenses

0.000

Other Adjustments

0.000

Net Profit

(94.500)

 


KEY RATIOS

 

PARTICULARS

 

 

31.03.2013

31.03.2012

31.03.2011

PAT / Total Income

(%)

0.03
3.87

3.70

 

 

 
 

 

Net Profit Margin

(PBT/Sales)

(%)

0.78
5.53

6.02

 

 

 
 

 

Return on Total Assets

(PBT/Total Assets}

(%)

0.85
5.74

5.97

 

 

 
 

 

Return on Investment (ROI)

(PBT/Networth)

 

0.04
0.25

0.27

 

 

 
 

 

Debt Equity Ratio

(Total Debt /Networth)

 

1.00
0.60

0.99

 

 

 
 

 

Current Ratio

(Current Asset/Current Liability)

 

1.07
1.29

1.46

 

 

LOCAL AGENCY FURTHER INFORMATION

 

 

Sr. No.

Check List by Info Agents

Available in Report (Yes / No)

1]

Year of Establishment

Yes

2]

Locality of the firm

Yes

3]

Constitutions of the firm

Yes

4]

Premises details

No

5]

Type of Business

Yes

6]

Line of Business

Yes

7]

Promoter's background

Yes

8]

No. of employees

Yes

9]

Name of person contacted

Yes

10]

Designation of contact person

Yes

11]

Turnover of firm for last three years

Yes

12]

Profitability for last three years

Yes

13]

Reasons for variation <> 20%

--

14]

Estimation for coming financial year

No

15]

Capital in the business

Yes

16]

Details of sister concerns

Yes

17]

Major suppliers

No

18]

Major customers

No

19]

Payments terms

Yes

20]

Export / Import details (if applicable)

No

21]

Market information

--

22]

Litigations that the firm / promoter involved in

Yes

23]

Banking Details

Yes

24]

Banking facility details

Yes

25]

Conduct of the banking account

--

26]

Buyer visit details

--

27]

Financials, if provided

Yes

28]

Incorporation details, if applicable

Yes

29]

Last accounts filed at ROC

Yes

30]

Major Shareholders, if available

Yes

31]

Date of Birth of Proprietor/Partner/Director, if available

Yes

32]

PAN of Proprietor/Partner/Director, if available

No

33]

Voter ID No of Proprietor/Partner/Director, if available

No

34]

External Agency Rating, if available

Yes

 

LITIGATION DETAILS

 

Lodging No.:-

ITXAL/1329/2013

Filing Date:-

22/08/2013

Reg. No.:-

ITXA/2043/2013

Reg. Date:-

21/10/2013

 

 

 

 

Petitioner:-

The Commissioner of Income Tax8,

Respondent:-

M/S KEC International Limited

 

 

 

Petn.Adv.:-

Arvind Pinto (0)

 

 

 

District:-

MUMBAI

 

 

 

 

Bench:-

DIVISION

 

 

 

 

Status:-

Pre-Admission

Category:-

TAX APPEALS

 

 

 

Next Date:-

04/12/2013

Stage:-

 

 

 

 

Coram:-

ACCORDING TO SITTING LIST

 

 

 

 

ACCORDING TO SITTING LIST

 

 

 

 

Act :-

Income Tax Act, 1961

Under Section:-

260A

 

 

MANAGEMENT DISCUSSION AND ANALYSIS

 

ECONOMY REVIEW

 

GLOBAL ECONOMIC SCENARIO

 

Economic growth showed early signs of improvement, particularly in the emerging and developing economies. Global GDP grew by 3.2% in 2012 and is expected to improve further to 3.3% in 2013 and 4.0% in 2014 (Source: IMF – April 2013).

 

The US Government undertook fiscal consolidation measures through spending cuts, resulting in a slowdown in growth. On the other hand, the 4 year low unemployment rate in February 2013 and recent improvement signals in the housing market are expected to drive a modest recovery next year. Besides, sustained policy measures are required in the Eurozone nations to help the economies recover.

 

INDIAN ECONOMIC SCENARIO

 

India’s economy witnessed strong GDP growth rates of 8.6% in Fy10 and 9.3% in Fy11. However, it declined to 6.2% in Fy12. The boost to consumption coupled with supply-side constrains resulted in higher inflation. This forced the reserve Bank of India (RBI) to tighten the monetary policy. Consequently, GDP growth rate suffered and registered a 5% growth in Fy13, the lowest in a decade. The slowdown in Fy13 has been seen across all sectors. Besides, the Eurozone    crisis and uncertainties about the US fiscal policy also had an adverse impact on the growth rate.

 

In Fy13, the inflation has remained consistently high. The current   account deficit reached an all-time high and also faced the risk of          breaching fiscal deficit targets. However, the last couple of quarters provided some ray of hope, with the Government pushing for several         policy reforms,   controlling FY 13 fiscal deficit to 4.9% of GDP.

 

Recently, the core inflation has been reducing due to softening commodity prices. This is providing some room to ease monetary policies and create the possibility of further rate cuts by the RBI. Business overview KEC International Limited (KEC or the Company) is an Infrastructure Engineering Procurement and Construction (EPC) major with presence in six business verticals – power transmission, power systems, cables, telecom, railways and water. The business is spread across 48 countries in South Asia, The Middle East, Africa, Central Asia, Americas and Southeast Asia.

 

INDUSTRY OUTLOOK AND OPPORTUNITIES ACROSS BUSINESS AND RELATED GEOGRAPHIES

 

POWER SECTOR REVIEW

 

The power sector’s growth is the key demand driver for a significant part     of the Company’ businesses (namely power transmission, power systems and cables) and therefore, this section takes a closer look at the global power scenario.

 

One-fourth of the global population is still without access to electricity. This includes a large percentage of population in South Asia (including India) and Sub-Saharan Africa. Their per capita power consumption is also much lower than the world average. The Company is present in most of these countries to meet the huge requirement of power infrastructure investments.

 

Power generation capacity investments should correspond to investments in transmission and distribution (T and D) infrastructure. Therefore, the global power T and D sector has strong growth prospects. Total investment needs for T and D from 2010 to 2020 is envisaged at uS$ 1.0 Trillion and uS$ 2.2 Trillion, respectively. Apart from generation-based T and D, old existing network replacements and grid strengthening and interconnections are also likely to drive demand. Many regions have planned to interconnect their grids.

 

Global power shortage and increasing demand are driving substantial investments in power generation. The global installed power generation capacity is predicted to increase from about 4,900 Gw in 2010 to 6,600 Gw in 2020 [Source: International Energy Agency (IEA)]. The estimated total investment required in the power sector is US$ 6.8 Trillion; out of this, US$ 3.7 Trillion is needed for power generation capacity addition. Growing pressure to reduce carbon emission and increase generation through renewable energy sources are also expected to drive generation investment.

 

POWER TRANSMISSION AND POWER SYSTEMS

 

BUSINESS

 

I) South Asia Region

 

A) India (Power Transmission)

 

India, an emerging economy experiencing rapid urbanisation and industrialisation, is the world’s fourth largest energy consumer. However, the country has always experienced power demand-supply gap. The peak power deficit for FY 13 is 8.7% (Source: Central Electricity Authority). This power deficit, coupled with an increasing demand, provides significant growth opportunities for India’s power sector.

 

In the draft of 12th Five year Plan, the Planning Commission has recommended a capacity addition target of 88,537 Mw, as compared to the 11th Five year Plan’s actual capacity addition of 54,964 Mw. An additional 30,000 Mw of renewable energy capacity addition is targeted during the 12th Five year Plan. Hence, there is an immediate need to create power transmission infrastructure to support this planned generation capacity expansion.

 

In the 12th Five year Plan, the transmission line capacity addition plan at 1,07,440 circuit kms is 54% higher than the 11th Five year Plan’s actual addition of 69,926 circuit kms. The Plan includes a multi-fold increase of 765 kv transmission lines addition, which requires a comparatively higher investment.

 

During the 12th Five year Plan, the Central Transmission utility, Power Grid Corporation of India Limited (PGCIL) plans to invest Rs.1000000.000 Millions in a phased manner for transmission line systems. These systems are associated with central sector linked generation, ultra Mega Power Projects (UMPP), Independent Power Producers (IPP) and grid strengthening.

 

Besides, Green Energy Corridors, viz. - transmission line system for power evacuation from renewable energy generation, needs to be created. PGCIL’s July 2012 report indicates a necessity of Rs.420000.000 Millions investments to create several transmission line corridors for 40,000 Mwrenewable energy generation capacities.

 

Apart from PGCIL, the State Electricity Boards (SEBs) are also planning investments to expand the intra-state transmission networks. In some cases, SEB’s investments are backed by multilateral funding agencies, like the world Bank, Asian Development Bank (ADB) and so on.

 

Private sector participation in the transmission sector is increasing. Till Fy13, nine transmission projects have been awarded through competitive bidding processes (BOO/BOOT/BOOM). The government is encouraging more private participation, even at the state level.

 

Challenges –The sector faces challenges related to fuel linkages, land acquisition, environment clearances, statutory clearances, right of way (ROW) and poor financial health of SEBs. Many of the SEBs have hiked their power tariffs to reduce financial            losses   and improve cash flows.  Further, the Government’s restructuring scheme to improve the financial health of   SEBs is expected to bring fresh investments in the TandD sector.  however, it needs to be seen how many SEBs can take advantage of this scheme.

 

INDIA (POWER SYSTEMS)

 

In the 12th Five  year Plan, the substation capacity addition at 2,70,000 MVA is 80% higher, as compared to actual addition (latest estimate) of 1,50,362 MVA during the 11th Five year Plan. Of the total capacities planned, 55% is at 765 kv level. The Company has already entered in this space by securing an order for a 765 kv gas insulated substation during Fy13. Internationally, the Company is currently executing substation project upto 1,150 kv in Kazakhstan.

 

SAARC COUNTRIES

 

KEC has strengthened its presence in the SAARC region, which has one of the lowest per capita power consumption globally. The region is displaying an encouraging business outlook in recent years.

 

India’s cross border electricity transmission interconnections with Bangladesh, Sri Lanka, Nepal and Bhutan are being expanded to facilitate power trade between the countries. For instance, Indo-Bangladesh grid interconnection transmission line is in its advanced stages of completion. The Indo-Nepal grid interconnection has moved forward with award of hetauda-Duhabi-Dhalkebar transmission line project. Besides, PGCIL is also undertaking steps to establish transmission links with Nepal and Bhutan. In addition to cross-border interconnection lines, the Governments of these countries are also focusing to improve their domestic transmission and distribution networks.

 

MENA REGION

 

The MENA region is experiencing rising power demand, which is expected to grow at 7% per annum through the coming decade (Source: Booz and Company). This growth is likely to be driven by economic development, increasing population, and industrial growth. The region is also diversifying fuel sources and investing in solar power generation. IEA expects the region’s power generation contribution from renewable sources to increase from 3% currently to 7% by 2030.

 

Gulf Cooperation Council (GCC) Countries –The GCC countries expect to invest US$ 10.7 Bn in transmission networks from 2013 to 2017 (Source: Arab Petroleum Investment Corporation). Saudi Arabia, the region’s largest market, has the highest power demand followed by UAE. They have planned several large power generating projects, including nuclear power plants. Besides, Kuwait and Oman have also announced their plans to expand transmission lines network to meet the growing power demand.

 

North Africa –After going through a stagnation phase for the last 2 years due to political unrest, the situation in North Africa is improving. The new political administrations, planning to restore basic growth fundamentals in the region, are focusing on the energy sector. Egypt, for example, has already announced fresh investment in transmission and distribution sector.

 

AFRICA REGION

 

The region’s per capita electricity consumption in 2010 (553 kwh v/s world average of 2,975 kwh) was one of the lowest globally. Moreover, with two-third of the population still without access to electricity, the region has significant growth potential. The multilateral funding agencies are allocating funds for the new projects in the region. Various cross-border transmission line interconnections are being planned to improve power transmission Infrastructure and create an efficient energy exchange among the countries.

 

CENTRAL ASIA REGION

 

Central Asia continues to be a high potential market with growing electricity demand due to its booming industrial sector. Several initiatives, supported and funded by multilateral institutions, are being undertaken to expand and upgrade the region’s soviet-era power infrastructure. The countries in the region are also working to improve their interconnections to ensure proper power flow between them. Kazakhstan, Turkmenistan, ukraine and Georgia are the major markets in this region. Among them, Kazakhstan is also opting for a considerable exposure in the renewable energy sector.

 

NORTH AMERICA AND LATIN AMERICA REGION

 

North America –The North America transmission system needs investment to build new lines and upgrade and refurbish the existing network. About 29,600 circuit miles transmission lines are planned to be added between 2012 and 2022. [Source: North American Electric reliability Corporation’s (NERC) 2012 Long-Term reliability Assessment report]. In other words, assuming US$ 1 Mn investments per mile, an investment of US$ 3 Bn per year would be required for the next 10 years.

 

In the US, many states have issued the renewable Portfolio Standards regulation. This directive mandates electricity suppliers to            produce a specified portion of their electricity from renewable energy sources. Solar and wind generation will also require incremental investment in power transmission infrastructure, as federal tax incentives continue to be extended through 2013. In Canada, new generation sources in Alberta and new hydroelectric generation expansion in Manitoba and New Foundland-Labrador have increased transmission lines demand.

 

North America’s existing transmission grid is ageing due to underinvestment in transmission infrastructure. Hence, investments are also required to refurbish existing networks to avoid power outages.

 

Latin America –In this region, majority of the Company’s business come from Brazil and Mexico. Brazil, the largest market in Latin America, is also an emerging economy. Brazil’s Government has planned to increase its power generation capacity by 61,560 Mw and transmission lines capacity by 42,553 kilometers between 2011 and 2020 (Source: Empresa de Pesquisa Energetica, Brazil). The most important power generation plants under construction are located in the north, while the more developed areas are in the southeast. This necessitates investment in long-distance transmission lines. Moreover, energy infrastructure also remains a priority for Brazil, as the country is hosting the 2014 FIFA world Cup and the 2016 Olympics.

 

In Mexico, the state-owned Commission Federal de Electricidad (‘CFE’) owns and operates transmission lines. The Company plans to focus on transmission line projects to evacuate power from upcoming wind generation, mostly in the southeast and the northeast regions. However, this may pose a challenge, considering CFE’s limited ability to fund new projects and limited private participation.

 

SOUTHEAST ASIA REGION

 

KEC re-entered this region in 2010 and is currently executing projects in Indonesia, The Philippines and Malaysia. Many countries in this region have formulated plans to increase their power generation capacity and grid expansion. Among the countries where opportunities exist (including Indonesia, The Philippines, Malaysia, Laos, Thailand and Cambodia), Indonesia provides the largest market. The country is embarking on a comprehensive upgradation of transmission infrastructure on grids in Java-Bali, Sulawesi and Kalimantan. However, most of these markets are dominated by local, Chinese and Japanese contractors.

 

CABLES BUSINESS – OUTLOOK AND OPPORTUNITIES

 

The Company manufactures power cables and telecom cables with the former constituting significant part    of its cables business.

 

During Fy13, the cables market size declined by over 20%, impacted by the electrical equipment industry’s downturn. The demand for power cables is mainly driven by the power sector, real estate and industries, such as steel, oil and gas, chemicals and so on. These sectors experienced slowdown in Fy13, driving the demand for power cables down. Moreover, many new players entered the market skewing the demand-supply dynamics.

 

The Government’s aggressive growth ambition in the power sector during the 12th Five year Plan, especially in the distribution segment, provides significant growth opportunities in power cables. The strategic initiatives of the Government mainly encompass technology upgrades, thereby augmenting the demand for high voltage and extra high voltage (EHV) cables.  Significant investments are also expected in India’s telecom space, driven by 3G/4G rollouts, which will boost the optical fiber cables demand.

 

TELECOM BUSINESS – OUTLOOK AND OPPORTUNITIES

 

Installation of optical fiber networks and telecom   towers drive the Company’s telecom business. It receives majority of its business from India. However, the Company also focuses on opportunities in international markets, mainly in the African countries.

 

India’s Government has approved to establish National Optical Fiber Network (NOFN) in October 2011 to provide broadband connectivity to the Country’s 2,50,000 Gram Panchayats. The Government plans to use existing networks of Bharat Sanchar Nigam Limited (BSNL), railtel and PGCIL for this purpose. The total investment for this is estimated at Rs.200000.000 Millions.

 

Challenges – The operators are not expanding their telecom tower networks, despite 3G rollout, subscriber growth and the existing network’s poor quality. however, future demand for better quality networks is likely to change this trend.

 

RAILWAYS BUSINESS – OUTLOOK AND OPPORTUNITIES

 

Presently, the Company’s business mainly comes from conventional railway projects. The Company is an integrated player and undertakes projects related to civil and track works, electrification and signaling works. The 12th Five year Plan envisages a total investment of Rs.6433790.000 Millions (including Metro rail). This amount is 146% more than 11th Five year Plan’s target and 229% more than 11th Five year Plan’s actual investments (latest estimate). The Company’s addressable market is about 10% of the targeted investment.

 

Dedicated Freight Corridors (DFC) –Presently, two dedicated freight corridors (DFC) are being developed in India – the western DFC (1,483 kms.) and the Eastern DFC (1,839 kms.). The fundings for these projects, scheduled to be completed by 2017, are already in place. As per India’s latest  railway Budget, construction contracts for 1,500 kms. line across both the corridors would be awarded in FY 14. KEC is pre-qualified in various portions of these projects and further looking to contribute in nation building by actively participating in this opportunity.

 

Mass rapid transit System (MRTS) –Increasing urbanisation, population density and strain on existing transport infrastructure have necessitated investments in the modern mass rapid transit system (metro and mono rails). The Delhi metro’s success has set the stage for developing more metro networks across the Country.

 

WATERBUSINESS – OUTLOOK AND OPPORTUNITIES

 

India’s water sector is experiencing strong demand drivers. The Government of India allocates funds for developing water-related infrastructure projects in two areas – water resource management and water and wastewater treatment. The Company focuses on opportunities in both the areas.

 

Despite having 16% of world’s population, India has only 4% of the globally available fresh water (Source: CII). This makes water one of India’s scarce resources. Moreover, only 34% of Indian population has sustainable access to improved sanitation facilities (Source: world Bank). Besides, out of the total wastewater generated, only 30% is treated before disposal, further increasing pollution (Source: Central Pollution Control Board). To improve the situation, the 12th Five year Plan envisages Rs.7596900.000 Millions total investment across various water infrastructure projects. It is 91% more than the planned target and 159% more than actual investments (latest estimate) in the 11th Five year Plan.

 

RENEWABLEENERGY BUSINESS – OUTLOOK AND OPPORTUNITIES

 

Globally, there has been an increasing focus on power generation through renewable energy. It is the fastest growing source of energy consumption currently. The Company is looking at EPC opportunities in the solar and wind energy space.

 

Solar is the most nascent and fastest growing renewable energy sector. Worldwide, solar installations have been growing at 50% plus compound annual growth rate (CAGR) over the last 3 years. The Company foresees opportunities in this space over the next few years. India’s solar power industry experienced a good start, driven by the success of Jawaharlal Nehru National Solar Mission (JNNSM) Phase-I. Among the states, Gujarat and Rajasthan have been the pioneers to install capacities. Many others have also announced their plans and policies for solar energy generation.

 

wind is one of the most mature renewable energy segments and is fast developing as an alternative energy option globally. KEC, with its lattice towers manufacturing expertise and strong EPC capabilities, will seek relevant

opportunities in this sector.

 

FINANCIAL PERFORMANCE

 

Analysis of Profit and Loss statement and Balance Sheet including the key ratios based on consolidated results is mentioned as follows:

 

Profit and Loss Statement Analysis

 

Net Sales increased by 20.03% y-o-y to Rs.69794.900 Millions, driven by strong execution and continuous order inflow. Out of the total net sales, 58.61% has come from the markets outside India.

 

EBITDA decreased by 19.08% y-o-y to Rs.3814.000 Millions. EBITDA margins declined by 264 basis points to 5.46% of net sales. The key reasons for margins reduction include challenging business environment, cost and time overruns in certain projects, severe competition and developmental costs for new businesses.

 

Depreciation and amortization expense increased to Rs.560.800 Millions from Rs.479.200 Millions in the Fy12. It has increased mainly due to capitalisation of new cable manufacturing facility at vadodara, Gujarat.

 

Finance Costs increased to Rs.1944.000 Millions from Rs.1597.400 Millions in Fy12. Higher working capital loan requirement due to higher sales and investments in vadodara cable manufacturing facility has resulted in this increase. However, Finance Costs to Net Sales ratio remained around the same levels at 2.79% as against 2.75% in Fy12.

 

Other Income stood at Rs.160.500 Millions as against Rs.616.300 Millions in Fy12. Other income for Fy12 included Rs.531.800 Millions profits on assignment of  leasehold rights in the land at vashi.

 

Net Profit stood at Rs.650.400 Millions as against Rs.2093.000 Millions in FY 12. Net Profit for the year FY 12 included Rs. 434.300 Millions post-tax profits on          assignment of leasehold rights in the land at Vashi.  Net  Profit decreased primarily due to lower EBITDA margins.

 

Earnings per Share (EPS) declined to Rs.2.53 from Rs.8.14 in fy12.

 

Price to earnings (PE) ratio stood at 19.27 times. (Based on Fy13 EPS and closing share price as on Fy13 result announcement day i.e. May 08, 2013)

 

Proposed Dividend for the year is 25% of face value of equity share, reflecting a distribution of Rs.152.200 Millions (including dividend distribution tax).

 

Balance sheet Analysis

 

Net Worth increased to Rs.11622.600 Millions from Rs.11078.100 Millions in Fy12. Equity Share Capital remained unchanged at Rs.514.200 Millions. However, reserves and Surplus increased to Rs.11108.400 Millions from Rs.10563.900 Millions recorded in Fy12. Book Value per share increased to Rs.45.21 from Rs.43.09 in Fy12.

 

Gross Borrowings increased to Rs.16690.100 Millions from Rs.12391.900 Millions in Fy12 while Net Borrowings increased to Rs.15134.000 Millions from Rs.10362.800 Millions in Fy12. This was primarily driven by increased working capital loans due to higher sales and capital investment in new cable manufacturing facility at vadodara, Gujarat. Gross Debt-equity ratio stood at 1.44 times while Net Debt- equity ratio stood at 1.30 times.

 

Fixed assets increased to Rs.10114.400 Millions from Rs.9219.100 Millions in Fy12. The increase is mainly due to investments in new cables manufacturing facility at vadodara, Gujarat.

 

Prudent working capital management has resulted in reduction in inventory, receivables and gross working capital cycles. Inventory cycle decreased to 21 days from 28 days in Fy12. Total receivable Cycle decreased to 179 days from 185 days in Fy12.

 

Gross working capital cycle reduced to 255 days from 270 days in Fy12.

 

Return on Capital employed(before tax) decreased to 12.94% in Fy13 as compared to 20.15% in Fy12. The key reason for reduction is lower EBITDA margins due to reasons mentioned previously.

 

OPERATIONAL PERFORMANCE

 

Commenced production at new   green field facility at vadodara, Gujarat to manufacture high-tension (Ht) and extra high voltage (EHV) power cables. with this plant, the Company increases its presence in the EHV power cables sector.

 

The order book increased to Rs.94700.000 Millions, registering a growth of 10.48%.

 

The year’s total order intake has increased by 19.96% to Rs.74840.000 Millions. The orders were spread across all business verticals and geographies.

 

The Company continues to expand its geographical presence. During the year it entered uganda and Turkmenistan and re-entered Indonesia after 10 years.

 

Secured orders from South Asia (India, Nepal, Sri Lanka, Bangladesh), Americas (United States, Mexico, Canada, Brazil), MENA (Saudi Arabia, Oman, UAE), Africa (uganda, Kenya, Nigeria, Tunisia), Central Asia (Turkmenistan) and Southeast Asia (the Philippines, Malaysia, Indonesia).

 

 Secured first order for 765 kV GIS substation worth Rs.400.000 Millions

 

Secured the first sewage treatment project worth Rs.1940.000 Millions in Maharashtra

 

The Company is looking at opportunities in the wind and solar EPC space.

 

Received many awards and recognitions during the year. Details are mentioned on page 18 and 19 of this annual report

 

UNSECURED LOAN

 

Particulars

As on

31.03.2012

(Rs. in

Millions)

From Banks

1834.764

From Other Parties

935.489

Total

2770.253

 

 

INDEX OF CHARGES

 

S.NO.

CHARGE ID

DATE OF CHARGE CREATION/MODIFICATION

CHARGE AMOUNT SECURED

CHARGE HOLDER

ADDRESS

SERVICE REQUEST NUMBER (SRN)

1

10304824

07/04/2012 *

1,200,000,000.00

EXPORT - IMPORT BANK OF INDIA

SAKAR II, NEAR ELLISBRIDGE SHOPPING CENTRE, ASHRAM ROAD, ELLISBRIDGE, AHMEDABAD, GUJARAT - 380006, INDIA

B38080842

2

10259513

22/12/2010

400,000,000.00

PUNJAB AND SIND BANK

BANK HOUSE, 21, RAJANDER PLACE, NEW DELHI, DELHI - 110001, INDIA

B02638922

3

10257075

03/05/2011 *

350,000,000.00

EXPORT-IMPORT BANK OF INDIA

FLOOR 21, CENTRE ONE BUILDING, WORLD TRADE CENTRE, CUFFE PARADE, MUMBAI, MAHARASHTRA - 400005, INDIA

B13160270

4

10230820

25/06/2010

1,000,000,000.00

IDBI TRUSTEESHIP SERVICES LIMITED

ASIAN BLDG., GROUND FLOOR, 17, R.KAMANI MARG, BALLARD ESTATE, MUMBAI, MAHARASHTRA - 400001, INDIA

A89706790

5

10198804

30/01/2013 *

88,500,000,000.00

BANK OF INDIA

MID CORPORATE BRANCH, 5 B.T.M SARANI, BRABOURNE R
OAD, KOLKATA, WEST BENGAL - 700001, INDIA

B66790072

6

10197447

13/05/2013 *

500,000,000.00

IDBI TRUSTEESHIP SERVICES LIMITED

ASIAN BUILDING, GROUND FLOOR, 17 R KAMANI MARG, BALLARD ESTATE, MUMBAI, MAHARASHTRA - 400001, INDIA

B78710621

7

10160904

26/03/2013 *

88,500,000,000.00

IDBI TRUSTEESHIP SERVICES LIMITED

ASIAN BUILDING, GROUND FLOOR, 17 R KAMANI MARG, BALLARD ESTATE, MUMBAI, MAHARASHTRA - 400001, INDIA

B72811367

8

10108502

25/06/2008

220,815,331.43

THE PRADESHIYA INDUSTRIAL AND INVESTMENT CORPORATION
OF U.P. LIMITED

PICUP BHAWN, GOMTI NAGAR, LUCKNOW, UTTAR PRADESH -
226010, INDIA

A40843278

9

10090177

20/02/2008

84,613,115.00

THE PRADESHIYA INDUSTRIAL AND INVESTMENT CORPORATI
ON OF U. P. LIMITED (PICUP)

PICUP BHAVAN, GOMTI NAGAR, LUCKNOW, UTTAR PRADESH
- 226010, INDIA

A33585571

10

10068109

06/08/2007

811,130,000.00

ICICI BANK LIMITED

LANDMARKRACE COURCE CIRCLE, ALKAPURI, BARODA, GUJARAT - 390015, INDIA

A23550973

 

Note: * Date of charge modification

 

STATEMENT OF STANDALONE UNAUDITED RESULTS FOR THE QUARTER AND SIX MONTHS ENDED 30.09.2013

(Rs. In Millions)

 

Quarter ended

Quarter ended

Six Months Ended

Particulars

30.09.2013

30.06.2013

30.09.2013

 

(Unaudited)

(Unaudited)

(Unaudited)

1 Income from operations

 

 

 

(a) Net sales from operations (Net of excise duty)

14795.300

14280.500

29075.800

(b) Other operating income

311.000

245.000

556.000

Total income from operations (net)

15106.300

14525.500

29631.800

2 Expenses

 

 

 

(a) Cost of materials consumed

8860.300

7707.600

16567.900

(b) Purchase of stock-in-trade

--

-

-

(c) Changes in inventories of finished goods, work-in-progress, scrap and stock-in-trade

(473.3000

(323.600)

(796.900)

(d) Erection & subcontracting expenses

3560.700

4050.900

7611.600

(e) Employee benefits expense

873.500

762.000

1635.500

(f) Depreciation and amortisation expense (net)

140.300

133.100

273.400

(g) Other expenses

1535.900

1720.800

3256.700

Total expenses

14497.400

14050.800

28548.200

3   Profit from operations before other income, finance costs and

608.900

474.700

1083.600

exceptional items (1-2)

 

 

 

4   Other income (Refer Note 3 below)

66.300

119.300

185.600

5 Profit from ordinary activities before finance costs and exceptional items (3 + 4)

675.200

594.000

1269.200

6 Finance costs

565.800

519.100

1084.900

7 Profit from ordinary activities after finance costs but before exceptional items (5-6)

109.400

74.900

184.300

8 Exceptional item (VRS Expenditure)

--

181.600

181.600

9 Profit / (Loss) from ordinary activities before tax (7-8)

109.400

(106.700)

2.700

10 Tax expense (Current quarter net of provision of Rs. 35.200 Millions pertaining to an earlier year, Year

27.900

(12.200)

15.700

ended 31/03/2013 - net of write back of provision pertaining to an earlier year Rs. 92.000 millions)

 

 

 

11 Net Profit / (Loss) from ordinary activities after tax (9-10)

81.500

(94.500)

(13.000)

12 Extraordinary Item

--

--

---

13 Net Profit / (Loss) for the period (11-12)

81.500

 

(94.500)

(13.000)

14 Paid up equity share capital

514.200

514.200

514.200

(Face Value Rs. each)

(2/-)

(2/-)

(2/-)

15 Reserves excluding Revaluation Reserves as per balance sheet of

 

 

 

previous accounting year

 

 

 

16 Basic and diluted Earnings Per Share (Rs.) - Before and after

0.32

(0.37)

(0.05)

extraordinary item (Not annualised)

 

 

 

See accompanying notes to the financial results

 

 

 

 

 

 

 

 

Quarter ended

Quarter ended

Six Months Ended

PARTICULARS

30.09.2013

30.06.2013

30.09.2013

 

(Unaudited)

(Unaudited)

(Unaudited)

A PARTICULARS OF SHAREHOLDING

 

 

 

1 Public shareholding

 

 

 

- Number of shares

134426213

140386674

134426213

- Percentage of shareholding

52.29%

54.61%

52.29%

2 Promoters and Promoter Group Shareholding

 

 

 

a) Pledged/Encumbered

 

 

 

- Number of shares

Nil

Nil

Nil

- Percentage of shares (as a % of the total shareholding of Promoter and Promoter group)

Nil

Nil

Nil

- Percentage of shares (as a % of the total share capital of the Company)

Nil

Nil

Nil

b) Non-encumbered

 

 

 

- Number of shares

122662157

116701696

122662157

- Percentage of shares (as a % of the total shareholding of Promoter and Promoter group)

100.00%

100.00%

100.00%

- Percentage of shares (as a % of the total share capital of the Company)

47.71%

45.39%

47.71%

Particulars

 

 

 

 

 

Quarter ended

 

 

 

30.09.2013

 

B INVESTOR COMPLAINTS

 

 

 

Pending at the beginning of the quarter

 

2

 

Received during the quarter

 

4

 

Disposed of during the quarter

 

6

 

Remaining unresolved at the end of the quarter

 

--

 

 

NOTES:

 

The above results of the Company were reviewed by the Audit Committee and approved by the Board of Directors at its meeting held on October 25, 2013.

 

The statutory auditors of the Company have conducted a "Limited Review" of the above Standalone unaudited financial results.

 

Other income includes:

 (Rs. In Millions)

 

Quarter ended

Quarter ended

Six Months Ended

PARTICULARS

30.09.2013

30.06.2013

30.09.2013

 

(Unaudited)

(Unaudited)

(Unaudited)

Dividend income from subsidiaries

51.200

65.600

116.800

 

The execution of the construction works under contracts of the Company with General Electric Company, Libya (a Government of Libya undertaking) is disrupted since February 2011 due to civil/political unrest in that country. The net assets (including fixed assets, trade receivables etc.) as at September 30, 2013 of the Company relating to these contracts aggregate Rs.669.500 Millions. The situation in Libya is returning to normal and the Company is confident of completing these projects.

 

STATEMENT OF ASSETS AND LIABILITIES

 

SOURCES OF FUNDS

 

30.09.2013

(Unaudited)

I.        EQUITY AND LIABILITIES

 

(1)Shareholders' Funds

 

(a) Share Capital

514.200

(b) Reserves & Surplus

9179.400

(c) Money received against share warrants

0.000

Total Shareholders’ Funds

9693.600

 

 

(3) Non-Current Liabilities

 

(a) long-term borrowings

1894.900

(b) Deferred tax liabilities (Net)

898.300

(c) Other long term liabilities

100.000

(d) long-term provisions

92.600

Total Non-current Liabilities

2985.800

 

 

(4) Current Liabilities

 

(a) Short term borrowings

10882.800

(b) Trade payables

26398.400

(c) Other current liabilities

9028.700

(d) Short-term provisions

853.600

Total Current Liabilities

47163.500

 

 

TOTAL

59842.900

 

 

II.      ASSETS

 

(1) Non-current assets

 

(a) Fixed Assets

8983.100

(b) Non-current Investments

63.700

(c) Deferred tax assets (net)

0.000

(d)  Long-term Loan and Advances

1561.500

(e) Other Non-current assets

913.600

Total Non-Current Assets

11521.900

 

 

(2) Current assets

 

(a) Current investments

0.000

(b) Inventories

4035.600

(c) Trade receivables

31383.500

(d) Cash and cash equivalents

645.600

(e) Short-term loans and advances

5036.300

(f) Other current assets

7220.000

Total Current Assets

48321.000

 

 

TOTAL

59842.900

 

The Company is primarily engaged in the business of Engineering, Procurement and Construction (EPC). As such there is no separate reportable segment as defined by the Accounting Standard (AS) 17 - "Segment Reporting" notified under the Companies (Accounting Standards) Rules, 2006.

 

Previous periods' figures have been regrouped / reclassified wherever necessary.

 

CONTINGENT LIABILITIES IN RESPECT OF:

 

(a) Claims against the Company not acknowledged as debts:

                                                                                                                                                (Rs. In Millions)

Nature of Claims

Relating to various years

comprise in the period

31.03.2013

 

 

 

Sales Tax/Value Added Tax*

(Tax/Penalty/Interest)

1993-2011

1993-2010

492.031

Excise Duty *

(Tax/Penalty/Interest)

1994-2013

1994-2012

262.936

Service Tax *

(Tax/Penalty/Interest)

1998-2013

2002-2010

1688.272

Entry Tax

(Tax/Penalty/Interest)

1995-2013

1995-2012

178.880

(i) Income Tax matters mainly in respect of disallowance of depreciation etc.

relating to Power Transmission

Business acquired by the Company

A.Y.2006-07 to 2009-10

--

(ii) Income Tax matters at overseas

unit/s

2002-2008

2002

346.258

Customs Duty

1995-1996

6.014

Civil Suits

1993-2006

1993-1994

7.202

Demands of employees/ sub contractors

Amount not determinable

 

 

*These claims mainly relate to the issues of applicability, issue of disallowance of cenvat / VAT credit and in case of Sales Tax / Value added tax, also relate to the issue of submission of ‘C’ forms and the Company’s claim of exemption for MVAT on export sales and services.

 

(b) Guarantees

 

Particulars

31.03.2013

 

(Rs. In Millions)

Guarantees given to banks for credit facilities extended/loans given to the wholly owned subsidiary companies / a joint venture Rs.10904.955 Millions (Previous Year Rs.8540.026 Millions) Facilities/loans outstanding at the Year end

5232.585

Performance guarantee given to a customer of the wholly owned subsidiary Company

 

--

Bank guarantees provided by the Company to customers of the wholly owned subsidiary companies in connection with the respective contracts awarded/bids made

 

105.918

Performance guarantee provided by a bank to the customer of the wholly owned subsidiary Company by utilising the Company’s credit facility with that bank

 

44.284

 

(c) Other money for which the Company is contingently liable:

 

Sr. No

Particulars

31.03.2013

1

 Bills discounted

426.303

2

Contingent liability of Income Tax taken over by the Company in terms of the Composite Scheme of Arrangement underwhich the Power Transmission Business was acquired by the Company

121.220

 

FIXED ASSETS:

 

·         Freehold and Leasehold Land

·         Buildings

·         Plant and Machinery

·         Computers

·         Furniture and Fixtures

·         Electrical Installations

·         Vehicles

·         Computer Software

·         Brand

·         Goodwill

 

PRESS RELEASES

 

KEC INTERNATIONAL WINS ORDERS WORTH RS. 5680.000 MILLIONS

 

Mumbai, November 13, 2013: KEC International Limited. (KEC), a global infrastructure EPC major, an RPG Group company has secured new orders of Rs. 5680.000 Millions in its Transmission and Cables businesses. Details are as follows -

 

Transmission Business:

 

In this business, the Company has secured orders in India, Bangladesh and Americas amounting to Rs. 4930.000 Millions.

 

India: Two orders involving supply and erection of 765 kV and 400 kV transmission lines in the state of Rajasthan and Haryana under the Northern Region System Strengthening Scheme (XXV) on turnkey basis. The orders are secured from the Power Grid Corporation of India Limited (PGCIL). The total value of orders is Rs. 3140.000 Millions.

 

Americas: : SAE Towers, the wholly owned subsidiary of the Company has secured orders for the supply of lattice towers, monopoles and hardware from United States, Brazil and Mexico. The total value of orders is Rs. 1300.000 Millions.

 

Bangladesh: : Order involving supply and erection of 132 kV transmission lines on turnkey basis. The order is secured from the Power Grid Company of Bangladesh (PGCB) Limited. The order value is Rs. 270.000 Millions.

 

Saudi Arabia: : Secured an additional order from its existing project in the country. The order value is Rs. 220.000 Millions.

 

Cables Business:

 

In this business, the Company has secured orders for the supply of Power and Telecom Cables. The total value of orders is Rs. 750.000 Millions.

 

About KEC International Limited.

 

KEC International is global infrastructure Engineering, Procurement and Construction (EPC) major. It has presence in the verticals of Power Transmission, Power Systems, Cables, Railways, Telecom and Water. The Company has powered infrastructure development in 50 countries across Africa, Americas, Central Asia, Middle East, South Asia and South East Asia. It is the flagship Company of the RPG Group.

 

About RPG Enterprise.

 

RPG Enterprises, established in 1979, is one of India's fastest growing business groups with a turnover over Rs. 170000.000 Millions. The group has more than fifteen companies managing diverse business interests in the areas of Tyre, Infrastructure, IT and Specialty.

 

 


 

CMT REPORT (Corruption, Money Laundering & Terrorism]

 

The Public Notice information has been collected from various sources including but not limited to: The Courts, India Prisons Service, Interpol, etc.

 

1]         INFORMATION ON DESIGNATED PARTY

No exist designating subject or any of its beneficial owners, controlling shareholders or senior officers as terrorist or terrorist organization or whom notice had been received that all financial transactions involving their assets have been blocked or convicted, found guilty or against whom a judgement or order had been entered in a proceedings for violating money-laundering, anti-corruption or bribery or international economic or anti-terrorism sanction laws or whose assets were seized, blocked, frozen or ordered forfeited for violation of money laundering or international anti-terrorism laws.

 

2]         Court Declaration :

No exist to suggest that subject is or was the subject of any formal or informal allegations, prosecutions or other official proceeding for making any prohibited payments or other improper payments to government officials for engaging in prohibited transactions or with designated parties.

 

3]         Asset Declaration :

No records exist to suggest that the property or assets of the subject are derived from criminal conduct or a prohibited transaction.

 

4]         Record on Financial Crime :

            Charges or conviction registered against subject:                                                  None

 

5]         Records on Violation of Anti-Corruption Laws :

            Charges or investigation registered against subject:                                                          None

 

6]         Records on Int’l Anti-Money Laundering Laws/Standards :

            Charges or investigation registered against subject:                                                          None

 

7]         Criminal Records

No available information exist that suggest that subject or any of its principals have been formally charged or convicted by a competent governmental authority for any financial crime or under any formal investigation by a competent government authority for any violation of anti-corruption laws or international anti-money laundering laws or standard.

 

8]         Affiliation with Government :

No record exists to suggest that any director or indirect owners, controlling shareholders, director, officer or employee of the company is a government official or a family member or close business associate of a Government official.

 

9]         Compensation Package :

Our market survey revealed that the amount of compensation sought by the subject is fair and reasonable and comparable to compensation paid to others for similar services.

 

10]        Press Report :

            No press reports / filings exists on the subject.

 


 

CORPORATE GOVERNANCE

 

MIRA INFORM as part of its Due Diligence do provide comments on Corporate Governance to identify management and governance. These factors often have been predictive and in some cases have created vulnerabilities to credit deterioration.

 

Our Governance Assessment focuses principally on the interactions between a company’s management, its Board of Directors, Shareholders and other financial stakeholders.

 

 

CONTRAVENTION

 

Subject is not known to have contravened any existing local laws, regulations or policies that prohibit, restrict or otherwise affect the terms and conditions that could be included in the agreement with the subject.

 

 

FOREIGN EXCHANGE RATES

 

Currency

Unit

Indian Rupees

US Dollar

1

Rs.62.58

UK Pound

1

Rs.101.42

Euro

1

Rs.84.70

 

 

INFORMATION DETAILS

 

Information Gathered by :

PLK

 

 

Report Prepared by :

KVT

 


 

SCORE & RATING EXPLANATIONS

 

SCORE FACTORS

 

RANGE

POINTS

HISTORY

1~10

6

PAID-UP CAPITAL

1~10

6

OPERATING SCALE

1~10

6

FINANCIAL CONDITION

 

 

--BUSINESS SCALE

1~10

6

--PROFITABILIRY

1~10

4

--LIQUIDITY

1~10

6

--LEVERAGE

1~10

6

--RESERVES

1~10

6

--CREDIT LINES

1~10

6

--MARGINS

-5~5

--

DEMERIT POINTS

 

 

--BANK CHARGES

YES/NO

YES

--LITIGATION

YES/NO

YES

--OTHER ADVERSE INFORMATION

YES/NO

NO

MERIT POINTS

 

 

--SOLE DISTRIBUTORSHIP

YES/NO

NO

--EXPORT ACTIVITIES

YES/NO

NO

--AFFILIATION

YES/NO

YES

--LISTED

YES/NO

YES

--OTHER MERIT FACTORS

YES/NO

YES

DEFAULTER

 

 

--RBI

YES/NO

NO

--EPF

YES/NO

NO

TOTAL

 

52

 

This score serves as a reference to assess SC’s credit risk and to set the amount of credit to be extended. It is calculated from a composite of weighted scores obtained from each of the major sections of this report. The assessed factors and their relative weights (as indicated through %) are as follows:

 

Financial condition (40%)            Ownership background (20%)                 Payment record (10%)

Credit history (10%)                    Market trend (10%)                                Operational size (10%)

 


 

RATING EXPLANATIONS

 

 

RATING

STATUS

 

 

PROPOSED CREDIT LINE

>86

Aaa

Possesses an extremely sound financial base with the strongest capability for timely payment of interest and principal sums

 

Unlimited

71-85

Aa

Possesses adequate working capital. No caution needed for credit transaction. It has above average (strong) capability for payment of interest and principal sums

 

Large

56-70

A

Financial & operational base are regarded healthy. General unfavourable factors will not cause fatal effect. Satisfactory capability for payment of interest and principal sums

 

Fairly Large

41-55

Ba

Overall operation is considered normal. Capable to meet normal commitments.

 

Satisfactory

26-40

B

Capability to overcome financial difficulties seems comparatively below average.

 

Small

11-25

Ca

Adverse factors are apparent. Repayment of interest and principal sums in default or expected to be in default upon maturity

 

Limited with full security

<10

C

Absolute credit risk exists. Caution needed to be exercised

 

 

Credit not recommended

NB

NEW BUSINESS

 

 

 

PRIVATE & CONFIDENTIAL : This information is provided to you at your request, you having employed MIPL for such purpose. You will use the information as aid only in determining the propriety of giving credit and generally as an aid to your business and for no other purpose. You will hold the information in strict confidence, and shall not reveal it or make it known to the subject persons, firms or corporations or to any other. MIPL does not warrant the correctness of the information as you hold it free of any liability whatsoever. You will be liable to and indemnify MIPL for any loss, damage or expense, occasioned by your breach or non observance of any one, or more of these conditions

This report is issued at your request without any risk and responsibility on the part of MIRA INFORM PRIVATE LIMITED (MIPL) or its officials.